Similar Projects
Breeze Apartments
New Construction, Infrastructure - 83,160 SF
Design
$24,000,000 CJ est. value
Ithaca, NY 14850

Lansing Town Center
New Construction, Infrastructure - 100,000 SF
Design
$14,000,000 CJ est. value
Lansing, NY 14882

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Freese Road Over Fall Creek
Infrastructure
Bidding
$100,000 CJ est. value
Dryden, NY 14850

Mowing, Landscaping, Snow Plowing and Salting
Term Contract
Post-Bid
Ithaca, Spencer, NY 14850

Cold Milling Work Order Contract
Term Contract, Infrastructure
Post-Bid

Pine Tree Road Safety Improvements
Infrastructure
Results
Ithaca, NY 14850

Bridge Washing
Infrastructure
Results
$2,000,000 est. value

Cornell University Thurston Hall Addition
Addition, Demolition, LEED Certification, Infrastructure - 50,550 SF
Construction
$29,500,000 CJ est. value
Ithaca, NY 14850

The Ruby Student Housing
Demolition, New Construction, Infrastructure
Pending Verification
$3,098,040 CJ est. value
Ithaca, NY 14850

The Ruby Student Housing
Demolition, New Construction, Infrastructure
Pending Verification
$3,098,040 CJ est. value
Ithaca, NY 14850

City Harbor Phase 2
New Construction, Infrastructure - 60,000 SF
Design
$65,000,000 CJ est. value
Ithaca, NY 14850

Manure Storage Expansion Project
Addition, Demolition, Infrastructure
Bidding
$1,400,000 CJ est. value
Lansing, NY 14882

College Avenue Reconstruction
Infrastructure
Post-Bid
Ithaca, NY 14850

Recycling Facility Pavement Upgrades
Infrastructure
Results
Ithaca, NY 14850

Last Updated 03/16/2023 02:05 PM
Project Title

Black Diamond Trail Over Flood Control Channel

Physical Address View project details and contacts
City, State (County) Ithaca, NY 14850   (Tompkins County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,519,596 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 19, 2022, this project has not yet been awarded. A timeline for award has not yet been established. P.I.N. 3950.75 The proposed project provides for the construction of a new multi-use trail over the Flood Control Channel to connect non-vehicular traffic between the intersection of Cecil Malone Drive and Cherry Street on the west of the channel to the Floral Avenue Trail on the east side of the channel. The project will consist of pile supported cantilever wall abutments and a prefabricated pedestrian bridge. The project is a Unit Price contract including a Base Bid. CR Number: 2091259 Any bid received after the deadline will be rejected, regardless of the delivery method. The City is not responsible for late delivery by any carrier service. The bids will then be publicly opened and read aloud. After the bid opening (within 24 hours), the bid tabulation will be emailed to bidders, posted on the City website, and can be made available upon request. Each bid shall be accompanied by a deposit in the amount of: Five Percent (5%) of the Total Gross Sum Bid in the form of a Certified Check, Bank Draft, or Bid Bond. Cash will not be acceptable as a deposit. Bid deposits of all unsuccessful bidders shall be returned promptly upon execution of the contract with the successful bidder. Amendments can only be accomplished by means of Addenda issued by the City of Ithaca or its designee. Written questions should be addressed to Christopher Sichak, P.E., of Erdman Anthony at SichakC@erdmananthony.com and copied to Addisu Gebre at AGebre@cityofithaca.org. Questions must be received by 5:00 on October 24 , 2022. The City reserves the right to reject any or all bids and to waive any informality or technicality in any bid in the interest of the Owner. Attention of Bidders is particularly called to the requirements for ensuring that employees, applicants for employment, and contractors are not discriminated against; refer to the Contract Documents for additional information. A DBE participation goal of 6% is required as part of this contract. Each Bidder submitting a Bid to the Owner shall execute and attach thereto, the Certification regarding Equal Employment Opportunity. Although the Bidder is not required to attach such Certification by proposed sub-contractors to his Bid, the Bidder is here advised of this requirement so that appropriate action can be taken to prevent subsequent delay in sub-contract awards Service-Disabled Veteran-Owned Set Aside: No Disadvantaged Owned Sub-Contracting Goal: 6% Contract term: 1 YEAR

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents