Similar Projects
The Charles Hotel
New Construction, Infrastructure - 86,000 SF
Design
$34,000,000 CJ est. value
Kalispell, MT 59901

Road Surfacing and Realignment
Term Contract
Design
$250,000 to $500,000 est. value
MT

Routing and Crack Sealing Bainville East and West and Culbertson West Wolf Point Area
Infrastructure
Post-Bid
Bainville, MT

Cold Milling, Texas Underseal, PMS Overlay, Bridge Repair, Guardrail, Rumble Strips, Seal and Cover and Pavement Markings on the Scobey-South
Infrastructure
Post-Bid
MT

2021 Water System Improvement Project
Infrastructure
Results
$4,499,772 CJ est. value
Bigfork, MT 59911

Rehabilitate Final 9.3 Miles of the Going-To-The-Sun Road and Replace Bridge Over Mcdonald Creek
Renovation, Term Contract
Results
West Glacier, MT 59936

Samaritan House Expansion
New Construction, Infrastructure, Build-out
Pending Verification
$6,000,000 CJ est. value
Kalispell, MT 59901

Gaoa Big Hole Recreation Site Renovations, Montana
Term Contract
Design
$500,000 to $1,000,000 est. value
Butte, MT 59707

Cold Milling, PMS Overlay, Seal and Cover, Guardrail, and Pavement Markings on the Fishtrap East and West
Infrastructure
Post-Bid
MT

Jct Sec 462 - East and West Nh-Nhpb 57-5(47)230
Infrastructure
Results
MT

Resurface, Gravel, Signing on the South of US-12 South S-381
Infrastructure
Post-Bid
MT

24th Street West Central Avenue Signal, Turn Lane, and Pedestrian Improvements
Infrastructure
Results
Billings, MT 59102

Reconstruct the Existing Gravel Roadway to a PMBS Surface in Great Falls
Infrastructure
Post-Bid
MT

Y--GAOA Stellar Creek Road Repair
Term Contract
Results
$500,000 to $1,000,000 est. value
Forsyth, MT 59327

Safety Improvements on the SF 179 Intersection Improvements
Infrastructure
Post-Bid

Last Updated 06/28/2023 04:07 PM
Project Title

2023 CDBG Curb Ramps and Sidewalks

Physical Address View project details and contacts
City, State (County) Yogo Crossing, MT 59479   (Judith Basin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $49,415 [brand] Estimate
Plans Available from Municipal Agency - 05/17/23
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work includes the removal and replacement of streetscape sidewalk along Maryland Ave. in accordance with the Americans With Disabilities Act (ADA). Traffic control, restoration, and other incidental items shall be included as shown in the specifications.This will be a Community Development Block Grant Program pursuant to Title I of the Housing and Community Development Act of 1974. The available funding is $22,500. Bidders must complete the attached Workforce Equity Report to be considered for award of this project. Not less than the prevailing hourly rate of wages shall be paid to all workers performing under this Contract in this area according to the rates determined by the U.S. Department of Labor and Industrial Relations. A bid security in the amount of five percent (5%) of the bid amount must accompany each bid in accordance with the Instructions to Bidders. THE CITY RESERVES THE RIGHT TO ACCEPT OR REJECT ANY BID AND TO WAIVE ANY IRREGULARITIES IN THE BEST INTEREST OF THE CITY. COMMUNITY DEVELOPMENT BLOCK GRANT DISCLAIMER This activity is funded in whole or in part with Community Development Block Grant funds pursuant to Title I of the Housing and Community Development Act of 1974, as amended. All applicable federal regulations shall be in full force and effect. SECTION 3 PROJECT STATEMENT Be advised that contracts over $200,000 trigger Section 3 of the Housing and Urban Development Act of 1968. Section 3 requires that economic opportunities generated by the expenditure of HUD funds be directed, to the greatest extent feasible, to low and moderate income persons via contracting, employment and training. All contractors and subcontractors working on this project will need to demonstrate compliance with Section 3 numeric targets and other applicable provisions. In cases where Section 3 compliance is not achieved, contractors and subcontractors must document good-faith efforts to comply. BUILD AMERICA BUY AMERICA STATEMENT Be advised that contracts over $250,000 or containing iron or steel trigger Build America Buy America (BABA) provisions requiring that materials be sourced to manufacturers within in the United States. Documentation must show that the contractor was able to source materials to United States' manufacturers or that materials and products subject to this preference are not produced within the United States or cannot be produced in sufficient quantity and quality. Bids that include United States' sourced material will be preferred if the total price of the bid response is within 25% of the lowest bid. In cases where BABA compliance is not achieved, contractors and subcontractors must document good faith efforts to comply.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents