Similar Projects
All One One All - A D'Artagnan Farm
Renovation, Infrastructure
Conception
$400,000 CJ est. value
Goshen, NY 10924

All One One All - A D'Artagnan Farm
Renovation, Infrastructure
Conception
$400,000 CJ est. value
Goshen, NY 10924

Sunrise Commons/ Tivoli Plaza
New Construction, Infrastructure - 56,100 SF
Design
$35,000,000 CJ est. value
Goshen, NY 10924

Sunrise Commons/ Tivoli Plaza
New Construction, Infrastructure - 56,100 SF
Design
$35,000,000 CJ est. value
Goshen, NY 10924

Shawangunk Dam Rehabilitation
Renovation, Infrastructure
Bidding
$3,000,000 CJ est. value
Wallkill, NY 10940

LEGOLAND Galleon Ride
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Goshen, NY 10924

1-Year Paving Contract
Term Contract, Infrastructure
Post-Bid
Kiryas Joel, NY

Middletown Traffic Operations Stage I and II, Downtown Revitalization Initiative: Streetscapes Improvements, Supplemental Streetscapes Improvements
Infrastructure
Post-Bid
Middletown, NY

Cold Milling
Results
NY

Roadway Asphalt Repair and Replacement
Infrastructure
Results
Goshen, NY

The Front Hotel
New Construction - 22,634 SF
Construction
$1,500,000 to $2,000,000 est. value
Port Jervis, NY 12771

Five Guys #1090
Renovation - 2,460 SF
Construction
Newburgh, NY 12550

Gardner Ridge Apartments
New Construction, Infrastructure
Pending Verification
$55,000,000 CJ est. value
Newburgh, NY 12550

New Century Alterations
Renovation
Pending Verification
Port Jervis, NY

King Road Solar Farm
New Construction, Infrastructure
Conception
$5,000,000 est. value
Middletown, NY 10941

Last Updated 10/26/2022 04:10 PM
Project Title

Dunkin - Med Parc Road & East Main Street / Middletown (Wallkill)

Physical Address View project details and contacts
City, State (County) Middletown, NY 10940   (Orange County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Seeking Site Plan Approvals, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is on the Planning Board Agenda for November 2, 2022. A firm construction timeline has not been determined.

Details

1 Story Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents