Similar Projects
270th Street NW Self Storage Facility
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Stanwood, WA 98292

I-405/SR 522 to SR 527 - Widening and Express Toll Lane
Infrastructure
Design
$510,000,000 CJ est. value
Bothell, WA 98012

SR 99/Lincoln Way Vic to Evergreen Way - ADA Compliance
Infrastructure
Design
$969,000 CJ est. value
Everett, WA 98208

RFQ D/B - I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

Interpretive Signage, SR530 Slide Memorial
Infrastructure
Bidding
$200,000 CJ est. value
Arlington, WA 98223

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

Whitehorse Trail Improvements
Renovation, Alteration
Post-Bid
WA

Tower Site Readiness Phase III Project
Infrastructure
Results
Arlington, Bothell, Darrington, Everett, Monroe, WA 98241

Swift Brt Orange Line Construction
Infrastructure
Results
Everett, WA 98201

SR 526 Corridor Improvements
Infrastructure
Design
$39,197,000 CJ est. value
Everett, WA 98203

Water Filter Plant Portal 4 Improvements Project
Renovation, Infrastructure
Bidding
$3,963,000 CJ est. value
Monroe, WA 98272

Skagit Wildlife Area North Leque Restoration
Infrastructure
Post-Bid
$375,000 est. value
Stanwood, WA

2021-2022 Capital Improvement Program - Jackson Elementary School
Renovation
Results
Everett, WA 98201

SR 531/43rd Ave NE to 67th Ave NE - Widening
Infrastructure
Design
$29,204,000 CJ est. value
Marysville, WA 98271

WWTP Near Term Tertiary Treatment Improvements
Infrastructure
Bidding
$2,550,000 CJ est. value
Marysville, WA 98270

Last Updated 09/16/2022 11:11 AM
Project Title

Construction of the New Sky Valley Transportation Facility Project

Physical Address View project details and contacts
City, State (County) Sultan, WA 98294   (Snohomish County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $5,056,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the construction of a new school district transportation cooperative facility including the new approximately 15,000 s.f building, housing vehicle service/ repair bavs andtransportation department administration area and associated sitework. The building includes the delegated design for the pre-engineered steel buulding, associated interior structures and sitework. Sitework includes bus and transportation parking lot with staff and visitor parking lots. Submission of Alternate Bids and List of HVAC, Plumbing and Electrical subcontractors is due by 3:00 pm on July 20, 2022 at the same location listed above. List of Structural Steel Installers and Rebar Installers is due by 2:00 p.m. on July 22, 2022 at the same location listed above. All work will be under a single contract. The estimated base bid project cost is $6,200,000. Each bid must be accompanied by a certified check, cashier's check or bid bond, with a State-licensed surety in an amount not less than five percent (5%) ofthe bid, made payable to the Sultan School District. Notice to Proceed is anticipated on or before August 10, 2022, Substantial Completion is established for December 10, 2023. Final completion shall be no later than januarv 10, 2024. No Bidder may withdraw or modify its Bid after the time set for the Bid opening until after 45 calendar days from the bid opening date. Questions may be directed to Lauren Johnson, Johansson Wing Architects, Lauren@johanssonwing.com. The Owner reserves the right to waive any informahties and to roject any or all Bids.

Details

15,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents