Similar Projects
NW 32nd Ave Resurfacing
Results
Less than $900,000 est. value
FL

I-10 Rest Area Reconstruction
Results

South Main Street at Williston Road Intersection Project
Results
Less than $56,000 est. value
Gainesville, FL 32601

Eliza Jones Rehabilitation
Results
Less than $45,039 est. value
Gainesville, FL 326270490

SR 26 at NW 122nd Street Intersection Project 9207901
Results
Less than $250,000 est. value
Gainesville, FL 32601

Asset Maintenance Contract for I-75 and I-10 for Lake City OPS
Results
Less than $35,000,000 est. value
Lake City, FL 32024

Resurfacing
Results
Less than $4,322,805 est. value
FL

Milling and Resurfacing/Drainage Improvements/Traffic Signals/Pavement Markings
Results
Less than $1,772,088 est. value
FL

Hot Plant-Mixed Bituminous Courses, Grading, Flexible Paving
Results

Emergency Roadside Assistance Services (I-75)
Results

SW Campus Transportation Improvements
Results
Gainesville, FL

Annual Roadway Milling Services
Results
Less than $2,000,000 est. value
FL

Annual Asphalt Concrete Surfacing Services
Results
FL

Resurfacing
Results
Less than $4,466,071 est. value
FL

Drainage Improvements/Milling and Resurfacing/Sidewalk
Results
Less than $5,669,760 est. value
FL

Last Updated 02/27/2020 05:33 AM
Project Title

Resurfacing

Physical Address View project details and contacts
City, State (County) FL   (Alachua County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,405,982
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consist of milling and resurfacing, sidewalk, curb and gutter, drainage improvements, traffic signals, highway signing, and other incidental construction on SR 20 in Alachua County from SR 26 to East of CR 329B. Section 0001 Roadway 0101- 1- Mobilization (43617615201) Ls 1.000 0102- 1- Maintenance Of Traffic (43617615201) Ls 1.000 0102- 14- Traffic Control Officer Hr 2,352.000 0102- 60- Work Zone Sign Ed 16,646.000 0102- 74- 1 Channelizing Device- Types i, Ii, Di, Vp, Drum, Or Lcd Ed 98,570.000 0102- 74- 7 Channelizing Device- Pedestrian Lcd (Longitudinal Channelizing Device) Lf 1,900.000 0102- 76- Arrow Board / Advance Warning Arrow Panel Ed 3,200.000 0102- 78- Temporary Retroreflective Pavement Marker Ea 1,536.000 0102- 99- Portable Changeable Message Sign, Temporary Ed 300.000 0102-104- Temporary Signalization And Maintenance, Intersection Ed 900.000 0102-107- 1 Temporary Traffic Detection And Maintenance, Intersection Ed 900.000 0104- 1- Artificial Coverings /Rolled Erosion Control Products Sy 45.000 0104- 10- 3 Sediment Barrier Lf 812.000 0104- 18- Inlet Protection System Ea 146.000 0107- 1- Litter Removal Ac 23.070 0107- 2- Mowing Ac 6.860 0110- 1- 1 Clearing & Grubbing (43617615201) Ls 1.000 0110- 4- 10 Removal Of Existing Concrete Sy 2,017.000 0120- 2- 2 Borrow Excavation, Truck Measure Cy 236.000 0120- 71- Regular Excavation (3-r Projects Only) (43617615201) Ls 1.000 0327- 70- 4 Milling Exist Asph Pavt, 3" Avg Depth Sy 94,684.000 0327- 70- 6 Milling Exist Asph Pavt, 1 1/2" Avg Depth Sy 61,074.000 0327- 70- 19 Milling Exist Asph Pavt, 3/4" Avg Depth Sy 2,653.000 0327- 70- 20 Milling Exist Asph Pavt, 3 3/4" Avg Depth Sy 14,532.000 0334- 1- 13 Superpave Asphaltic Conc, Traffic c Tn 9,010.300 0334- 1- 53 Superpave Asphaltic Concrete, Traffic c, Pg76-22 Tn 1,216.300 0337- 7- 25 Asphalt Concrete Friction Course, Inc Bit, Fc-5, Pg 76-22 Tn 688.200 0337- 7- 83 Asphalt Concrete Friction Course,Traffic c, Fc-12.5, Pg 76- 22 Tn 12,917.200 0425- 1-355 Inlets, Curb, Type p-5, Partial Ea 2.000 0425- 1-455 Inlets, Curb, Type j-5, Partial Ea 29.000 0425- 1-465 Inlets, Curb, Type j-6, Partial Ea 4.000 0425- 5- Manhole, Adjust Ea 4.000 0425- 5- 1 Manhole, Adjust, Utilities Ea 15.000 0425- 6- Valve Boxes, Adjust Ea 51.000 0520- 1- 10 Concrete Curb & Gutter, Type f Lf 1,466.000 0522- 1- Concrete Sidewalk And Driveways, 4" Thick Sy 904.000 0522- 2- Concrete Sidewalk And Driveways, 6" Thick Sy 610.000 0522- 3- Bus Boarding Pad- Concrete Sy 28.000 0527- 2- Detectable Warnings Sf 1,147.000 0570- 1- 2 Performance Turf, Sod Sy 2,960.000 0710- 11-101 Painted Pavement Markings, Standard, White, Solid, 6" Gm 12.618 0710- 11-102 Painted Pavement Markings, Standard, White, Solid For Interchange And Urban Island, 8" Gm 0.017 0710- 11-123 Painted Pavement Markings, Standard, White, Solid For Crosswalk And Roundabout, 12" Lf 6,620.000 0710- 11-124 Painted Pavement Markings, Standard, White, Solid For Diagonal Or Chevron, 18" Lf 6,316.000 0710- 11-125 Painted Pavement Markings, Standard, White, Solid For Stop Line Or Crosswalk, 24" Lf 1,390.000 0710- 11-131 Painted Pavement Markings, Standard, White, Skip, 10-30 Or 3-9 Skip, 6" Wide Gm 7.458 0710- 11-141 Painted Pavement Markings, Standard, White, 2-4 Dotted Guideline/ 6-10 Dotted Extension, 6" Gm 3.700 0710- 11-170 Painted Pavement Markings, Standard, White, Arrows Ea 71.000 0710- 11-201 Painted Pavement Markings, Standard, Yellow, Solid, 6" Gm 6.726 0710- 11-224 Painted Pavement Markings, Standard, Yellow, Solid For Diagonal Or Chevron, 18" Lf 60.000 0710- 11-241 Painted Pavement Markings, Standard, Yellow, 2-4 Dotted Guideline/6-10 Dotted Extension, 6" Gm 1.629 0999- 25- Initial Contingency Amount, Do Not Bid (43617615201) Ls 1.000 Section 0002 Signing 0700- 1- 11 Single Post Sign, f&i Ground Mount, Up To 12 Sf As 2.000 0700- 1- 12 Single Post Sign, f&i Ground Mount, 12-20 Sf As 2.000 0700- 1- 50 Single Post Sign, Relocate As 1.000 0700- 1- 60 Single Post Sign, Remove As 3.000 0710- 90- Painted Pavement Markings, Final Surface (43617615201) Ls 1.000 0711- 11-102 Thermoplastic, Standard, White, Solid, 8" For Interchange And Urban Island Gm 0.017 0711- 11-123 Thermoplastic, Standard, White, Solid, 12" For Crosswalk And Roundabout Lf 6,620.000 0711- 11-124 Thermoplastic, Standard, White, Solid, 18" For Diagonals And Chevrons Lf 6,312.000 0711- 11-125 Thermoplastic, Standard, White, Solid, 24" For Stop Line And Crosswalk Lf 1,390.000 0711- 11-141 Thermoplastic, Standard, White, 2-4 Dotted Guideline/ 6-10 Gap Extension, 6" Gm 3.700 0711- 11-170 Thermoplastic, Standard, White, Arrow Ea 71.000 0711- 11-224 Thermoplastic, Standard, Yellow, Solid, 18" For Diagonal Or Chevron Lf 60.000 0711- 11-241 Thermoplastic, Standard, Yellow, 2-4 Dotted Guide Line /6- 10 Dotted Extension Line, 6" Gm 1.629 0711- 14-125 Thermoplastic, Preformed, White, Solid, 24" For Crosswalk Lf 2,496.000 0711- 14-160 Thermoplastic, Preformed, White, Message Ea 71.000 0711- 14-170 Thermoplastic, Preformed, White, Arrow Ea 71.000 0711- 15-101 Thermoplastic, Standard-Open Graded Asphalt Surfaces White, Solid, 6" Gm 1.047 0711- 15-131 Thermoplastic, Standard-Open Graded Asphalt Surfaces, White, Skip, 6",10-30 Skip Or 3-9 Lane Drop Gm 0.934 0711- 15-201 Thermoplastic, Standard-Open Graded Asphalt Surfaces, Yellow, Solid, 6" Gm 0.929 0711- 16-101 Thermoplastic, Standard-Other Surfaces, White, Solid, 6" Gm 11.161 0711- 16-131 Thermoplastic, Other Surfaces, White, Skip, 6",10-30 Skip Or 3-9 Lane Drop Gm 6.328 0711- 16-201 Thermoplastic, Standard-Other Surfaces, Yellow, Solid, 6" Gm 5.637 0711- 17- 1 Thermoplastic, Remove Existing Thermoplastic Pavement Markings- Surface To Remain Sf 191.000 Section 0003 Signalization 0630- 2- 11 Conduit, Furnish & Install, Open Trench Lf 22.000 0630- 2- 12 Conduit, Furnish & Install, Directional Bore Lf 450.000 0632- 7- 2 Signal Cable- Repair/Replace/Other, Furnish & Install Lf 787.000 0632- 7- 6 Signal Cable, Remove- Intersection Pi 5.000 0635- 2- 11 Pull & Splice Box, f&i, 13" x 24" Cover Size Ea 11.000 0646- 1- 11 Aluminum Signals Pole, Pedestal Ea 1.000 0646- 1- 60 Aluminum Signals Pole, Remove Ea 1.000 0653- 1- 11 Pedestrian Signal, Furnish & Install Led Countdown, 1 Way As 18.000 0653- 1- 12 Pedestrian Signal, Furnish & Install Led Countdown, 2 Ways As 7.000 0660- 4- 11 Vehicle Detection System- Video, Furnish & Install Cabinet Equipment Ea 5.000 0660- 4- 12 Vehicle Detection System- Video, Furnish & Install Above Ground Equipment Ea 5.000 0665- 1- 11 Pedestrian Detector, Furnish & Install, Standard Ea 34.000 0665- 1- 60 Pedestrian Detector, Remove- Pole/Pedestal To Remain Ea 32.000 0670- 5-400 Traffic Controller Assembly, Modify As 5.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Roadway Signaling and Control Equipment, Traffic Signals.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents