Similar Projects
Herbert Akins Road Middle School(M-14)
New Construction - 170,000 SF
Construction
Fuquay-Varina, NC 27526

M15 Fuquay-Varina Middle School
Renovation
Sub-Bidding
Fuquay-Varina, NC

H12 New High School
New Construction
Design
Less than $152,291,274 est. value
Apex, NC 27539

Lineberry Hall Auditorium
Renovation
Post-Bid
Raleigh, NC 27606

Two Elementary School Renovation/Replacements, One New Elementary School, One New Middle School with High School Component, and One 6-12 Alternative Learning Program School
Renovation
Post-Bid
Cary, NC 27519

General Construction and Repair - Central Region
Results
Raleigh, NC

General Construction and Repair - East Region
Term Contract
Results
Raleigh, NC

General Construction and Repair - North Region
Renovation, Term Contract
Results
Raleigh, NC

General Construction and Repair - South Region
Renovation, Term Contract
Results
Raleigh, NC

General Construction and Repair - West Region
Renovation, Term Contract
Results
Raleigh, NC

Seeding and Fertilizing
Term Contract
Post-Bid
Raleigh, NC

Moore Square Magnet Waterproofing Repairs - 2021
Renovation
Results
Less than $315,850 est. value
Raleigh, NC 27601

Neuse River Middle School Bathroom Facility Project
New Construction
Post-Bid
Neuse, NC 27604

Combo RTP M-19/H-11 Middle and High School
New Construction
Design
$128,149,254 est. value
Morrisville, NC 27560

2022 Kitchen Repair Project Moore Square Magnet Middle School
Renovation
Post-Bid
$200,000 to $250,000 est. value
Raleigh, NC 27601

Reported 02/03/2022 01:32 PM
Project Title

West Millbrook Middle School Project

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27615   (Wake County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Nearing Completion
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Construction will occur in two phases on the existing school site. Phase 1: Construction of new 250,000 sf middle school on site of existing park and fields. Students will continue to use existing middle school building without fields in phase 1. at completion of phase 1, students will move from existing school to new building. Phase 2: Existing buildings will be demolished and new physical education/athletic fields will be installed. 2. Construction of bus maintenance building and transportation parking lot (Phase 2). 3. Offsite improvements. 4. Building will be three story, steel framed construction for classroom wing and load bearing masonry for the remaining wing. 5. Brick veneer and metal panel exterior skin systems. 6. Modified bitumen roof system on light weight insulating concrete. 7. Four pipe, VAV system mechanical system. Release 1 Bid Packages (Release 1 Prequalification Forms are Due 7-15-2020 01A-Building Cleaning, 08B-Overhead Doors, 09B-Hard Tile, 09C-Acoustical, 09D-Wood Flooring, 09E-Resilient/Carpet, 09F-Painting, 10B-Markerboards, 10C-Signage, 10D-Operable Partitions, 10E-Canopies, 10F-Specialties, 10G Lockers, 11A-Food Service Equipment, 11B-Theater & Stage Equipment, 11D Athletic Equipment, 12A-Window Treatment, 12B–Auditorium Seating, 12D–Lab Casework, 12E–Media Center Shelving and 13C–Bleachers. Release 2 Bid Packages due 7/14/2020 02D-Site Concrete, 02E-Fencing, 02F-Landscaping, 02K Demolition and Abatement, 02L-Offsite Improvements, 04A Masonry, 06A-Casework, 07A Waterproofing, 07B-Roofing, 07C-Fireproofing, 07D-Metal Panels, 08A Aluminum & Glass, 08C-Doors/Frames/Hardware, 09A-Drywall, 09G-Terrazzo, 14A Elevators, 15A–Plumbing, 15B-Fire Protection, 15C HVAC, 15D-HVAC Controls, and 16A- Electrical.

Details

1 Middle/Senior High School, 250,000 SF New Construction.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents