Similar Projects
Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Bidding

Bridge Related Repairs
Post-Bid
Saint Petersburg, FL 33731

Bridge-Preventative Maintenance and Emergency Repair Services
Term Contract
Post-Bid
Dunedin, Indian Shores, Tarpon Springs, FL

Philippe Park Pedestrian Bridge
Results
$463,335 est. value
Safety Harbor, FL

I-275 HFB TBNext Section 3
Results

Sun Island Exit Bridge Over Boca Ciega Bay - Bridge #157601
Renovation
Construction
South Pasadena, FL

2021 Bridge Repairs
Post-Bid
Saint Pete Beach, FL 33706

Bridge Repair/Rehabilitation
Results
$285,802 est. value
FL

Westwinds and Crosswinds Drive Bridges Replacement (PID 000700A and 000702A)
Results
Less than $3,733,958 est. value
Clearwater, FL 33755

R and R Minor Bridge
Results
Less than $2,700,000 est. value
FL

Bridge Repairs/Rehab (BDI)
Results
Less than $780,000 est. value
FL

Bridge Maintenance and Repair
Results
Saint Petersburg, FL 33731

R and R Intermediate Bridges
Results
Less than $741,200 est. value
FL

Bridge Maintenance and Repair- Phase II
Results
Saint Petersburg, FL 33731

Bridge Replacement
Results
Less than $4,071,792 est. value
FL

Last Updated 07/28/2020 11:10 AM
Project Title

2020 Bridge Repairs

Physical Address View project details and contacts
City, State (County) Saint Pete Beach, FL 33706   (Pinellas County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $248,495
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To perform the necessary repairs to the Vina Del Mar and Boca Ciega Isle bridges. The Contractor shall furnish all labor, materials, equipment, and incidentals necessary to perform the work as described in the bid documents and as shown on the plans. Estimated quantities are listed for the pay items in the Bid Form. Contractors for repairs to the Vina Del Mar and Boca Ciega Isle bridges. The Vina Del Mar bridge is located on 21st Avenue between Pass-a-Grille Way and W Vina Del Mar Blvd in St. Pete Beach. The Boca Ciega Isle bridge is located on 46th Avenue between Plaza Way and Boca Ciega Isle Dr

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents