Similar Projects
Freight Rail Facility Expansion
Conception
$13,224,090 to $26,500,000 est. value
Riviera Beach, FL

West Aventura Passenger Rail Station
New Construction
Design
Aventura, FL

Ultimate Urban Circulator Program Phase I: Bay Street Innovation Corridor - Two Step Process
Bidding
Jacksonville, FL

West Aventura Passenger Rail Station - Construction Services Consultant
Term Contract
Post-Bid
Miami, FL 33180

SEF Track Reconstruction - Package 2
Post-Bid
$2,500,000 to $5,000,000 est. value
Sebring, FL 33870

Jay-Jay Bridge Cross Tie Replacement and Rail System Repairs
Results
Merritt Island, FL 32952

Railroad Trestle Repairs
Results
Less than $360,000 est. value
Jacksonville, FL 32226

Brightline - Phase II - West Palm Beach-Orlando Line
New Construction, Renovation
Construction
$1,500,000,000 est. value
Orlando, FL

Brightline - Phase II - West Palm Beach-Orlando Line
New Construction, Renovation
Construction
$1,500,000,000 est. value
Orlando, FL

Rapid Mass Transit Solution for the North Corridor
Term Contract
Post-Bid
Miami, FL

Rapid Mass Transit Solution for the Beach Corridor Trunk Line
Results
Miami, FL 33128

SCFE SE Extension Phase V - US 27 / CR 880 Signal Project
New Construction
Construction
Belle Glade, FL 33430

Phase I and Phase II Track Rehabilitation Project
Post-Bid
Palmetto, FL 34221

Heavy Station Maintenance and Station Improvements
Results
Less than $2,625,093 est. value
Fort Lauderdale, Hollywood, West Palm Beach, FL 33407

Central Florida Rail Corridor(CFRC) - Capital Improvements - Multiple Locations
Term Contract
Post-Bid

Last Updated 03/10/2021 10:22 AM
Project Title

East Gate Rail and Crossing Improvements

Physical Address View project details and contacts
City, State (County) Panama City, FL 32401   (Bay County)
Category(s) Transportation
Sub-Category(s) Railroad/Subway
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $169,975
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, equipment, and materials to perform all work for the East Gate Rail and Crossing Improvements. The work will include the furnishing of all necessary permits, materials, equipment, machinery, tools, apparatus, means of transportation, and labor necessary to complete the referenced project.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents