Similar Projects
Houston Ship Channel House Tract Seepage Repairs
Design
$10,000,000 est. value
Houston, TX

Water, Sanitary Sewer and Drainage Facilities with Alternate Paving and Appurtenances to Serve North Diamondhead Boulevard Phase 1 and Newport Pointe Section 1
Bidding
TX

Construction of Proposed Water, Non-Potable Water line, Drainage and Paving Improvements on Shimmering Fields Section 1
Bidding
TX

Repair and Rehabilitation Services for Levee Rehabilitation Downstream of Siphon 21
Post-Bid
Less than $333,340 est. value
Highlands, TX

Vince and Little Vince Bayou Harvey Repairs, Harris County, Texas
Post-Bid
$250,000 to $500,000 est. value
TX

Flood Control Systems Equipment for Harris County
Results
TX

Construction of River Ranch Detention Pond A, B, and C
Results
Houston, TX

Lakeshore Way Drainage Improvements
Bidding
TX

Sims Bayou Harvey Repairs, Harris County, Texas
Post-Bid
TX

HPW FY 2020 Drainage Rehabilitation (Swat) Work Orders 1
Results
Less than $4,000,000 est. value
Houston, TX

Construction of Westwood Subdivision Maple Leaf Box Culverts and Magnolia Creek Ditch Extension
Post-Bid
Houston, TX

HPW FY 2020 Local Drainage Program (LDO) Contract 2
Results
Less than $3,000,000 est. value
Houston, TX

Houston Ship Channel Placement Area 15 Improvements
Post-Bid
$5,000,000 to $10,000,000 est. value
Houston, TX 77002

FY2020 Local Drainage Program (LDP) Contract 3
Results
$2,500,000 est. value
Houston, TX 77000

Lake Houston Pump Station Screen Channel Rehabilitation
Post-Bid
Crosby, TX 77532

Last Updated 01/22/2020 08:06 AM
Project Title

Exploration Green Detention Facility Phase 3A

Physical Address View project details and contacts
City, State (County) Clear Lake City, TX 77058   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,520,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the excavation of a detention pond and backslope swales including additional grading outside the upper bank, the removal and disposal of all unnecessary excavation and materials off-site at a location determined by the Contractor, the removal of existing storm sewer lines, and existing storm sewer manholes. The work includes to remove any existing portions of A.C. waterline per OSHA standards, the installation of backslope interceptor structures and HDPE outfalls to the proposed pond, the installation of an outfall structure and overflow swale, the installation of storm sewer manholes with grate inlet tops and outfall pipes, the installation of a storm sewer manhole with frame and cover, the installation of type ā€œEā€ inlets, the installation of 2-inch PVC conduit for future aeration system wiring, installation of 2-inch purple polytubing reclaimed irrigation line, placement of a 6-inch thick, 10 foot wide concrete trail, preparing seed bed in all areas within the filter fabric fencing to the normal water surface elevation, placing native grass seed mix and/or wildflower mix in the area within the filter fabric fencing to the top of the wetland area and hydro mulching of seeded areas and site cleanup.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents