Similar Projects
FY21 USACE Galveston District, FY21 Houston Ship Channel Oyster Mitigation, Harris County, Texas
Term Contract
Design
$10,000,000 to $25,000,000 est. value
Houston, TX

Phase 3 Detention and Drainage Facilities to Serve Del Bello Lakes
Infrastructure
Bidding
TX

Willowcrest Subdivision Paving, Drainage and Sanitary Improvements
Infrastructure
Bidding
$14,812,969 est. value
Pearland, TX

Reinforced Concrete Storm Sewer Box Culverts Annual Contract
Term Contract
Post-Bid
Pearland, TX 77581

Piper Road Drainage Project
Post-Bid
Pearland, TX

Freeport Harbor Levee Stabilization Wall Project
Results
Freeport, TX 77541

Holiday Lakes Flood and Drainage Improvements
Results
$671,062 est. value
Angleton, TX 77515

Construction of Water, Sanitary, and Drainage Facilities for Sierra Vista West Section 10
Infrastructure
Bidding
TX

CDBG-DR Drainage and Paving Improvements
Post-Bid
Holiday Lakes, TX

Manvel Town Center Public Detention Ponds Phase 1A and Manvel Town Center Public Utilities Phase 1A
Results
TX

Pond Liner Installation at Sea Center Texas and Dundee Fish Hatchery
Infrastructure
Bidding
Electra, Lake Jackson, TX 77566

Repair and Rehabilitation of the Caroline Tunnels for Harris County Precinct 2
Infrastructure
Post-Bid
Houston, TX

Z--IDIQ for Stream Gage Site Rprs, Oklahoma and Texas
Results

2021 Stormwater Management Master Plan Drainage Improvements, Phases 1 and 2
Infrastructure
Bidding
$1,200,000 est. value
Richwood, TX

Construction of Water, Sanitary, and Drainage Facilities Sierra Vista West Section 7
Infrastructure
Post-Bid
TX

Last Updated 12/02/2021 07:55 AM
Project Title

Mustang Bayou Bank Repair at National Oaks Park

Physical Address View project details and contacts
City, State (County) Alvin, TX 77511   (Brazoria County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $101,710
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes repairs to the banks of Mustang Bayou within the limits of National Oaks Park, from the existing observation deck running approximately 110' north. The work consists of significant brush clearing, regrading of the channel slope, and slope stability repairs utilizing geotextile supported grade 2 riprap.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents