Similar Projects
Trenton Liquid Natural Gas Manufacturing Facility
New Construction, Infrastructure
Conception
$2,800,000,000 CJ est. value
Trenton, ND 58801

Trenton Liquid Natural Gas Manufacturing Facility
New Construction, Infrastructure
Conception
$2,800,000,000 CJ est. value
Trenton, ND 58801

Pavement Preservation North Dakota
Term Contract
Design
$5,000,000 to $7,000,000 est. value
Buford, Dickinson, ND

Bethel Lutheran Nursing and Rehabilitation Center
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Williston, ND 58801

Western Area Water Supply Authority - McKenzie County Water Resource District Phase II Transmission Line
Infrastructure
Bidding
$1,500,000 CJ est. value
Williston, ND 58801

Western Area Water Supply Authority - McKenzie County Water Resource District Phase II Transmission Line
Infrastructure
Bidding
$1,500,000 CJ est. value
Williston, ND 58801

Hawkeye Village Phase II Improvements
Infrastructure
Post-Bid
Williston, ND

Landfill Cells 1-4 2022 Intermediate Cover Grading
Infrastructure
Post-Bid
$500,000 CJ est. value
Williston, ND 58801

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

507 Railroad Avenue Site Restoration
Results
$539,000 est. value
Ray, ND 58849

Little Beaver Bay Bank Stabilization
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Tioga, ND 58852

60th Street Reconstruction
Results
$750,000 to $1,000,000 est. value
Williston, ND

Farris Subdivision - 50th Drive Northwest
Infrastructure
Results
$190,000 to $210,000 est. value
Williston, ND 58801

Mill and Overlay, Guardrail, ADA Ramps, Adjust Utility Appurtenance
Infrastructure
Results
ND

Mill and Overlay
Infrastructure
Results
$3,500,001 to $4,000,000 est. value
ND

Last Updated 09/09/2022 03:05 PM
Project Title

SAFuelsX Sustainable Aviation Production Plant

Physical Address View project details and contacts
City, State (County) Williston, ND 58801   (Williams County)
Category(s) Heavy and Highway, Industrial/Manufacturing, Sewer and Water
Sub-Category(s) Industrial Warehouse, Paving/Reconstruction, Power Plant, Sewage Treatment Plant, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected March 2022
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located on approximately 87 acres. Scope details have not been released. As of June 8, 2021 the project is in design stage. The Williams Board of County Commissioners approved a conditional use permit June 1, 2021. An engineering, purchasing and construction contractor has been chosen, but the developer has not yet disclosed their information. The construction timeline has not been determined, but may begin in the spring of 2022.* *Absolutely no inquiries will be accepted at this time.

Details

1 Story Above Grade, New Construction, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Security Equipment, Laboratory Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents