Similar Projects
Last Updated | 09/01/2022 05:06 PM |
Project Title | 8th Street Extension Project |
Physical Address | View project details and contacts |
City, State (County) | Scott City, KS 67871 (Scott County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $734,436 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 8th Street Extension project consisting of three independent schedules of work. The Schedule One (1) work includes: 1 lump sum (LS) mobilization; 1 LS Stormwater Management Plan; 1 LS existing utility potholing; 840 lineal feet (LF) of 6-inch C900 DR18 PVC water pipe; 3 each (EA) connection to existing pipelines; 3 EA of 4-inch gate valve; 4 EA of 6-inch gate valve; 1 EA of 6-inch fire hydrant assembly; 15 EA of 1-inch service tap on PVC; 405 LF of 1-inch SIDR7 polyethylene service line; 1 LS to remove existing utilities as shown on Sheet 3 of the drawings; 600 LF of 8-inch C900 SDR35 PVC sanitary sewer pipe; 1 EA to remove and dispose of existing manhole; 3 EA of new manholes; 2 EA of connection to existing 8-inch VCP sanitary sewer; 1 LS bypass pumping; together with all incidental materials of construction, complete in place. The Schedule Two (2) work includes: 1 LS mobilization; 1 LS cut permits complete with traffic control plans pursuant to the requirements of the City of Scott County; 1 LS clear and grub topsoil; 90 square yards (SY) sawcut and remove asphalt; 543 square ft (SF) 6-inch compacted base coarse; 543 SF concrete cross pan; 3,073 SY of 4-inch base coarse and 4-inch thick hot mix asphalt; 1,580 LF of curb and gutter; together with all incidental materials of construction, complete in place. The Schedule 3 work includes: 1 LS mobilization; 1 LS Stormwater Management Plan; 1 LS cut permits complete with traffic control plans pursuant to the requirements of the City of Scott City; 15 SY sawcut and remove asphalt; 8 SY of 4-inch base coarse and 4 inch thick hot mix asphalt; 462 LF of curb and gutter; together with all incidental materials of construction, complete in place. A certified check or bank draft, payable to the order of the City of Scott City (Owner) negotiable U.S. Government bonds (at par value) or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total Bid shall be submitted with the Bid. Bidders on this work will be required to comply with the president's Executive Order No. 11246 (Equal Employment Opportunity) as amended. Requirements for Bidders and Contractors under this order are explained in the Information for Bidders of these Specifications. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |