Similar Projects
Last Updated | 07/05/2023 10:32 AM |
Project Title | Replace HVAC & Controls-Shady Grove State School |
Physical Address | View project details and contacts |
City, State (County) | Poplar Bluff, MO 63901 (Butler County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Construction start expected July 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $630,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replacing the energy recovery unit, boiler, pumps, heat pumps, fluid cooler, & exhaust fans as well as adding a makeup air unit in the kitchen & a new DDC control system to connect all new & existing equipment. The project includes includes replacing the energy recovery unit, boiler, pumps, heat pumps, fluid cooler, and exhaust fans as well as adding a makeup air unit in the kitchen and a new DDC control system to connect all new and existing equipment The State reserves the right to reject any and all bids and to waive all informalities in bids. No bid may be withdrawn for a period of 20 working days subsequent to the specified bid opening time. The contractor shall pay not less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial Relations and as set out in the detailed plans and specifications |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |