Similar Projects
MM Five Lane Part 3 - City of Republic
Infrastructure
Conception
$4,000,000 est. value
Republic, MO

MM Five Lane Part 2 - City of Republic
Infrastructure
Conception
$3,200,000 est. value
Republic, MO

MM Five Lane Part 1 - City of Republic
Infrastructure
Conception
$2,000,000 est. value
Republic, MO

Farm Road 103 (Future MM) South Of US 60 - City of Republic
Infrastructure
Conception
$1,500,000 est. value
Republic, MO 65619

Prairie View Road South of 64th street - 89008182 - City of Kansas City
Infrastructure
Conception
$300,000 CJ est. value
Kansas City, MO 64153

Minor Park- Build pickleball courts - 390225 - City of Kansas City
New Construction, Infrastructure
Conception
$379,000 CJ est. value
Kansas City, MO 64131

Hyde Park Restroom - 319615 - City of St.Joseph
New Construction, Infrastructure
Conception
$482,820 CJ est. value
Saint Joseph, MO 64504

Rehabilitation General Aviation Apron - Phase 1 - 413020 - City of St.Joseph
Infrastructure
Conception
$5,000,000 est. value
Saint Joseph, MO 64504

Northside Complex Splash Park - 250696 - City of Saint Joseph
Infrastructure
Conception
$2,000,000 CJ est. value
Saint Joseph, MO 64501

Genefield Road Bridge - 220100 - City of St.Joseph
New Construction, Infrastructure
Conception
$1,750,000 est. value
Saint Joseph, MO 64504

6th Street Viaduct - 2020 General Obligation Bond - City of St. Joseph
Renovation, Infrastructure
Conception
$201,070 est. value
Saint Joseph, MO 64504

Extend Hinkson Creek Substation Feeders - E0193 - 1837 - City of Columbia
Infrastructure
Conception
$10,000,000 CJ est. value
Columbia, MO 65203

PCCE #29 - East Sunset Lane - SW522 - 1909 - City of Columbia
Infrastructure
Conception
$345,000 CJ est. value
Columbia, MO 65203

Wornall Reconstruction - 75th to 79th - City of Kansas City
Infrastructure
Conception
$4,100,000 CJ est. value
Kansas City, MO 64114

Wornall Road Reconstruction - Gregory Boulevard to 75th Street - City of Kansas
Infrastructure
Conception
$5,200,000 CJ est. value
Kansas City, MO 64114

Last Updated 06/20/2023 07:32 AM
Project Title

Resurface - Route 21

Physical Address View project details and contacts
City, State (County) Ellington, MO 63638   (Reynolds County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $7,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J9S3371 Route N IRON, REYNOLDS County. Resurface from Route 21 N near Pilot Knob to Route 21 S near Lesterville, the total length of improvement being 18.956 miles. (2): Job J9S3468 Route TT REYNOLDS County. Resurface from Route KK to Route 72 near Reynolds, the total length of improvement being 3.675 miles. (3): Job J9S3613 Route KK IRON, REYNOLDS County. Resurface from Route 32 to Route 72 near Bunker, the total length of improvement being 20.114 miles. Range: $2.5M to $5M Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to Director of Revenue, Credit State Road Fund, or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of Missouri, acting by and Through the Missouri highways and transportation commission", as Obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. All Questions Concerning the Project Should Be Directed to the Project Contact Listed in the Job Special Provisions of the Request for Bid. All Questions Concerning Bid Document Preparation Can Be Directed to the Central Office - Design Division at (573) 751-2876. MO DOT - H01 - Resurface - Route 21 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. FEDERAL PROJECT NUMBER(S) FAS S703(94), FAS-S704(048), FAS-S704(3)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents