Similar Projects
RFP Engineering - 10th Avenue South Bridge Engineering and Design
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Minneapolis, MN 55414

RFP Engineering - 10th Avenue South Bridge Engineering and Design
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Minneapolis, MN 55414

Reconstruction and Resurfacing With Pedestrian ADA and Utilities
Infrastructure, Alteration
Design
$5,400,000 est. value
Barnesville, MN 56514

Reconstruction and Resurfacing With Pedestrian ADA and Utilities
Infrastructure, Alteration
Design
$5,400,000 est. value
Barnesville, MN 56514

South Saint Paul Library
New Construction, Infrastructure - 16,200 SF
Bidding
$7,000,000 CJ est. value
South Saint Paul, MN 55075

North Smoky Hills Graveling
Renovation
Post-Bid

North Smoky Hills Graveling
Renovation
Post-Bid

2021 Chip Seal
Results
Less than $138,712 est. value
Marshall, MN

Mill and Bituminous Overlay
Results
MN

Upper Harbor Redevelopment - Future Phases
New Construction, Infrastructure
Design
$150,000,000 CJ est. value
Minneapolis, MN 55415

780th Ave Pavement Replacement
Infrastructure
Post-Bid
MN

Brooklyn Boulevard Trail
Results
$320,293 est. value
Brooklyn Center, MN 55430

2022 Hornsby Street Reconstruction - Love's Travel Plaza
Infrastructure
Post-Bid
$200,000 est. value
Columbus, MN 55025

2nd Street Southeast
Results
Willmar, MN 56201

Summer Maintenance - Road Grading
Infrastructure
Post-Bid
Le Sueur, MN

Last Updated 08/03/2022 02:04 PM
Project Title

Bituminous Pavement Crack Sealing on Cook County Roads

Physical Address View project details and contacts
City, State (County) Grand Marais, MN 55604   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $88,893 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 3, 2022, project was awarded to Northwest Asphalt & Maintenance, awarded amount is $88,893.25. This Work consists of sealing random transverse and longitudinal cracks in bituminous pavement in accordance with MnDOT 2104, and the Plans. Bituminous Pavement Crack Sealing on Cook County Roads Project Major Items: Number Item Units Quantity 2331.619 Rout and Seal Bituminous Pavement Cracks Road Sta 691.00 2563.601 Traffic Control Lump Sum 1.00 Expected Award Date:07/26/2022 Project Start Date:07/04/2022 Construction Start Date:07/04/2022 Construction End Date:09/10/2022 LOCATION: Various Roads in Cook County Minimum wage rates to be paid by the Contractors have been predetermined and are subject to the Work Hours Act of 1962, P.L. 87-581 and implementing regulations. Bids and required contractor forms must be completed and accompanied by a Bidder's Bond in an amount equal to at least 5% of the total bid. The county reserves the right to adjust any and all quantities to stay within project funds. The county reserves the right to reject any or all bids and to waive any irregularities thereof

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents