Similar Projects
Southern Oaks
New Construction
Conception
Narcoossee, Saint Cloud, FL 34771

Peninsula Bay - Master Plan
New Construction
Design
Cortez, FL 34210

Bonita Grande Weir Repairs
Bidding
FL

Design-Build Floating Day Dock and Dinghy Dock
Bidding
Bradenton Beach, FL 34217

DeSoto Park ADA Floating Kayak Launch
Post-Bid
Satellite Beach, FL 32937

Removal, Derelict Marine Vessels
Post-Bid
Less than $50,000 est. value
Tampa, FL 33601

Design-Build Construction Delivery Method for New Fire Stations
New Construction - 17,250 SF
Results
Jacksonville, FL

Trout River Floating Dock Demolition
Results
Less than $56,060 est. value
Jacksonville, FL

The Harbour in Historic Coconut Grove
New Construction, Renovation - 112,200 SF
Construction
$17,900,000 est. value
Coconut Grove, FL

North Cargo Berth 8 Extension
Construction
Less than $8,000,000 est. value
Cape Canaveral, FL 32920

CT5 Mooring Improvements
Bidding
$2,000,000 est. value
Cape Canaveral, FL 32920

Black Point Marina - Dock Reconstruction
Post-Bid
Less than $804,000 est. value
Homestead, FL 33032

Carl Gray Park Boat Ramp Improvements
Results
$250,000 est. value
Panama City, FL

Dock Demolition at the Jupiter Inlet Lighthouse Outstanding Natural Area
Bidding
Jupiter, FL

Wharf and Wall Repairs
Post-Bid
Palmetto, FL 34221

Last Updated 04/30/2021 10:05 AM
Project Title

Cessna Landing Fishing Pier Replacement

Physical Address View project details and contacts
City, State (County) FL   (Wakulla County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $156,818
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Cessna Landing Fishing Pier replacement project work scope to include demolition of existing pier in its entirety and construction of a new pier to include pilings, structure, deck boards, handrails, and permanent signage as detailed in project plans/specifications. Project also includes new concrete sidewalks and ADA accessible parking area with concrete wheel stops, pavement striping, and signage. All work to be completed in accordance with project plans/specifications and USACE permit. All temporary barricades, silt fence, turbidity barriers, signage, and other control measures are the responsibility of the Contractor. All vegetation disturbed as part of the project shall be restored or replaced to pre-construction condition.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents