Similar Projects
Ga011 HVAC-Elec-Plumb East Point, GA 81st Readiness Division(Rd)
Alteration
Bidding
$500,000 est. value
East Point, GA 30344

HVAC and Mechanical Products
Term Contract
Post-Bid

Replace Boiler and Cooling Tower at Douglass High School
Post-Bid
Atlanta, GA 30318

Design Build Services for The Replacement/Refurbishment of AHUs and Associated Fans
Results
GA

Rialto and Haas-Howell HVAC Upgrades
Results
Less than $850,000 est. value
Atlanta, GA 30302

Replace Gymnasium HVAC Units at Washington High School
Post-Bid
Atlanta, GA 30314

Maintenance of Supplemental Cooling Systems
Term Contract
Results
Atlanta, GA 30334

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC Maintenance and On-Call Services
Results
Milton, GA

Air Purification System
Alteration
Post-Bid
GA

HVAC Filters and Related Supplies
Results
Atlanta, GA

35 Broad Street Infrastructure Upgrades
Alteration
Post-Bid
Less than $1,400,000 est. value
Atlanta, GA

College Law, AHU-1 Rooftop Ductwork Insulation Repairs
Results
Atlanta, GA 30303

Countywide Spot Cooler and Heat Pump Rental
Alteration
Post-Bid
GA

HVCAR Services for Marta`s Headquarters Complex
Results
Atlanta, GA 30324

Last Updated 06/17/2022 02:59 AM
Project Title

Sparks Hall Phase 3 3rd Floor HVAC Upgrades

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30303   (Fulton County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $375,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for this project will include complete removal of all existing ceilings, lighting, mechanical equipment, ductwork, piping, and controls as required by the contract documents. New systems and components will be installed per the contract documents. Georgia State University is upgrading the mechanical HVAC systems in Sparks Hall. The first phase of the project installed one roof-top DOAS unit and a portion of the 4th floor HVAC system. Phase 2 of the project completed the HVAC system on the 4th floor, installed a second DOAS unit on the roof and partially replaced the 3rd floor HVAC system. Phase 3 will complete the 3rd floor HVAC system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents