Similar Projects
Pavement Evaluations for Interstate Maintenance
Alteration
Bidding
$25,000 est. value

2022 Bryan County Road Program
Alteration
Bidding
GA

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

2021 Bryan County Road Program
Post-Bid
GA

Southern Region Disaster Recovery Support BPA
Results

First Street Resurfacing, Street, Water Extension
Results
Richmond Hill, GA 31324

T32 - District 5 Routine Maintenance Services
Infrastructure
Post-Bid
Baconton, Evans, GA 30809

Mill Hill Road Improvements
Results
Richmond Hill, GA 31324

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

Oak Level and Polk Road Repairs
Infrastructure
Post-Bid
Ellabell, Richmond Hill, GA 31324

LMIG Street Resurfacing
Results
College Park, GA 30337

2021 Road Repair Project: Oak Level Road and Polk Road
Infrastructure
Post-Bid
Ellabell, Richmond Hill, GA 31324

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

Annual LMIG Paving and Street Repair Contract
Term Contract
Post-Bid
Richmond Hill, GA

Last Updated 04/05/2022 09:16 AM
Project Title

Rosemont Street Extension

Physical Address View project details and contacts
City, State (County) Richmond Hill, GA   (Bryan County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The Work to be bid consists of furnishing all materials, labor and equipment for the Construction of: Rosemont Street Extension The Work is generally described as follows: Extend Rosemont Street approximately 300 LF which includes, Installation of BMP (Erosion, Sedimentation and Pollution Control Best Management Practices), Demolition, removing and replacing of unsuitable subbase material. Grading of roadway and ditches. Installation of permanent grassing. Installation of drainage system which includes ditches, miscellaneous reinforced concrete pipe (RCP) and rip rap. Installation of 12 inch PVC and tie-in. installation of 6” deep GAB road base and 1.5” asphalt concrete GDOT 12.5 mm superpave surface. Construction of 14’ wide 12.5 mm asphaltic driveways.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents