Similar Projects
Elkhorn River Bank Stabilization - City of Scribner and Dodge County
Infrastructure
Conception
$1,000,000 CJ est. value
Scribner, NE 68057

Runway and Taxiway - Fremont Municipal Airport
Infrastructure
Design
$7,300,000 CJ est. value
Fremont, NE 68025

Runway and Taxiway - Fremont Municipal Airport
Infrastructure
Design
$7,300,000 CJ est. value
Fremont, NE 68025

Chipotle Mexican Grill - Site and Shell / Fremont
New Construction, Infrastructure - 2,325 SF
Bidding
$700,000 CJ est. value
Fremont, NE 68025

Ridge Drive Reconstruction
Infrastructure
Post-Bid
$300,000 est. value
Hooper, NE 68031

Paving Reconstruction
Infrastructure
Post-Bid
$300,000 est. value
Scribner, NE

Rawhide Creek Trail, Fremont
Infrastructure
Results
Less than $5,000,000 est. value
NE

West 16th Street Asphalt Overlay
Infrastructure
Results
$400,000 est. value
Fremont, NE 68025

Logan View Public Schools Elementary Addition
Addition, Demolition, Infrastructure
Construction
$2,219,000 CJ est. value
Hooper, NE 68031

Keene Memorial Library Renovation - Bid Package 1
Addition, Renovation, Infrastructure - 34,340 SF
Construction
$6,200,000 CJ est. value
Fremont, NE 68025

Highway 77 Self-Storage
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Inglewood, NE 68025

Ritz Lake - Phase II
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fremont, NE 68025

Fremont High School Project - Bid Package 4 Site Work
Infrastructure
Post-Bid
$300,000 CJ est. value
Fremont, NE 68025

Clarkson Street Asphalt Overlay
Infrastructure
Results
$400,000 est. value
Fremont, NE 68025

Fremont Public Schools New Elementary Schools
New Construction, Infrastructure - 210,000 SF
Construction
$17,980,000 CJ est. value
Fremont, NE 68025

Last Updated 05/31/2023 11:46 AM
Project Title

Join Parachute / Fremont

Physical Address View project details and contacts
City, State (County) Fremont, NE 68025   (Dodge County)
Category(s) Commercial, Heavy and Highway, Medical
Sub-Category(s) Car Wash, Medical Office/Outpatient, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,800,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

This remodel will take place AFTER HOURS & IN PHASES in an operating center, with the following CONSTRUCTION hours: o Mon-Fri. 8:00 PM - 5:00 AM o Saturday & Sunday 8:00 PM - 5:00 AM AGAIN, ALL TRADES AND SCOPES OF WORK need to be done AFTER HOURS, as to minimize any distractions to the business. There will be an opportunity to do some of the work during center operating hours, which will be coordinated with Octapharma staff and Facilities Manager, BUT CAN'T BE COUNTED ON. *The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder.

Details

1 Story Above Grade, 6,507 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents