Similar Projects
Samford University Recreation Center and Athletic Complex
New Construction, Infrastructure - 154,000 SF
Conception
$65,000,000 est. value
Homewood, AL

Plaza Drive / Oak Drive Drainage Improvements
Infrastructure
Design
$430,000 CJ est. value
Dothan, AL 36301

Demolition and Clearance Work for Various Structures
Demolition, Infrastructure
Design
$30,000 CJ est. value
Sheffield, AL 35660

Welcome Center Replacement (Site Construction/Grading, Drainage, Pavement, Lighting, and Structures) on I-65
Infrastructure
Bidding
$6,770,759 CJ est. value
Athens, AL 35613

Belforest Water System Raw Water Main K-6 Well #5 to Larry Street Road WTF #4
Infrastructure
Bidding
$400,000 CJ est. value
Daphne, AL 36526

Automated Exit Gates and Installation
Infrastructure
Sub-Bidding
$250,000 CJ est. value
Montgomery, AL 36108

Demolition of Auditorium at W.S. Neal High School
Demolition, Infrastructure
Sub-Bidding
$290,000 CJ est. value
East Brewton, AL 36426

Geneva County Jail Site Improvements
Post-Bid
Geneva, AL 36340

Final Grading for the Evergreen Inert Landfill Closure
Post-Bid
Evergreen, AL

Modernization of Public Housing Site AL117-1A and AL117-1B Roofing
Results
$24,800 est. value
Chatom, AL

New St. Clair County Jail - Pell City - Bid Package -1 Civil
Results
$1,888,000 est. value
Ashville, Pell City, AL 35125

Thyssenkrupp Materials
Addition - 88,200 SF
Construction
$13,000,000 est. value
Woodstock, AL 35188

Clyde May Whiskey Distillery
New Construction - 26,319 SF
Construction
$14,000,000 to $15,000,000 est. value
Troy, AL 36082

Polyplex Manufacturing
New Construction - 70,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Decatur, AL 35601

Delta Industrial Park
New Construction
Pending Verification
Tuscaloosa, AL 35401

Last Updated 08/10/2022 07:05 AM
Project Title

Aviagen Elkmont Egg Depot - Bid Package 3

Physical Address View project details and contacts
City, State (County) Elkmont, AL 35620   (Limestone County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Negotiating General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Henning Companies is the negotiated general contractor for the new Egg Depot addition at the current Aviagen facility in Elkmont, AL. The project is approximately 15,000sf and is a precast structure with load bearing walls and double T roof. The complete project consists of site demolition, sitework, new parking lot, concrete, precast, loading docks, IMP walls, minimal office finishes and MEP. Bid package 03 is the Civil (demo, sitework, paving and site improvements), Masonry, Membrane Roofing and Site Utilities. Future bid packages with include building finishes.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents