Similar Projects
Olympus Master Plan
New Construction - 861,283 SF
Conception
$10,000,000 CJ est. value
Clermont, FL 34711

The Village at Town Center
New Construction, Renovation - 50,000 SF
Conception
Jacksonville, FL

International Swimming Hall of Fame Complex
New Construction - 20,000 SF
Design
$70,900,000 est. value
Fort Lauderdale, FL

Old Naples Hotel
New Construction, Build-Out, Demolition - 6,230 SF
Design
Naples, FL

DFWB Convention Center HVAC Improvements and Restroom Renovations
Renovation
Bidding
Fort Walton Beach, FL 32548

South Walton Athletic Facility Baseball Complex Project
Post-Bid
FL

Donaldson Park Restrooms Improvements
Renovation
Post-Bid
Avon Park, FL 33825

Crews Riverside Park Pavilion
New Construction - 550 SF
Results
Wauchula, FL 33873

Dunns Creek State Park and Faver-Dykes State Park - Restroom Replacements
Results
Saint Augustine, FL 32086

Kindred - Phase 2
New Construction - 1,906,608 SF
Construction
Kissimmee, FL 34744

Alfond Inn at Rollins College - Phase 2
New Construction
Construction
$24,623,940 est. value
Winter Park, FL 32789

Multipurpose Youth Sports Complex
New Construction
Pending Verification
$5,997,870 est. value
Green Cove Springs, FL

Pinecrest Academy Gymnasium
New Construction, Addition - 12,651 SF
Conception
Miami, FL 33185

Tiater Town
New Construction - 23,175 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Stuart, FL 34997

Continuing Contracts for Construction Manager at-Risk Services
Post-Bid
Plant City, FL

Reported 02/04/2022 02:26 PM
Project Title

Phase II - Skybox/ Concession Stand/ADA Restrooms Repair/ Renovation of Bragg Memorial Stadium

Physical Address View project details and contacts
City, State (County) Tallahassee, FL 32307   (Leon County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility, Restroom/Bath House
Contracting Method
Project Status Construction Commenced December 2021, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This phase includes the removal and replacement of the existing press box. The initial portion of phase would include an analysis of the needs of the University for the size and use of this facility. The concession stands/restroom renovation would be to upgrade and modernize the existing restrooms and concession stands.

Details

Athletic Facility, Renovation, Restroom/Bath House, Renovation.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents