Similar Projects
Last Updated | 02/19/2021 04:28 PM |
Project Title | P1395 SOF Marine Raider Regiment HQ, MCAS, Camp Lejeune |
Physical Address | View project details and contacts |
City, State (County) | Camp Lejeune, NC 28445 (Onslow County) |
Category(s) | Government/Public |
Sub-Category(s) | Misc. Buildings |
Contracting Method | |
Project Status | Construction Commenced December 2020 |
Bids Due | View project details and contacts |
Estimated Value | $10,000,000 to $25,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This work constructs 2,788 SM (30,000 SF) of Headquarters Facilities and includes miscellaneous supporting structures, utilities, parking, roadways, sidewalks, running trails, and site work. The structures will be single-story steel frame buildings with brick veneer over metal studs, standing seam metal roofs, metal soffits, and translucent wall panels. Special construction features include soil surcharge loads, and storm water best management practices. Electrical systems include primary power distribution, lighting, energy monitoring/control systems, intrusion detection system, telephone/data switch/server rooms, electrical switch gear, transformers, circuits, and fire alarms. Mechanical systems include plumbing, fire protection, compressed air, dehumidification, air conditioning systems, and digital controls. Information systems include telephone, data, local area network, mass notification and intercom. Site work will include building utility systems, traffic control, parking, domestic water, fire protection water, sanitary sewer, sewage conveyance, propane gas networks, perimeter security fencing, gates, storm water management, fiber/copper communications, cable television, and area lighting. Department of Defense principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development features will be included in the design and construction of this project as appropriate. This project will provide Anti-Terrorism/Force Protection (AT/FP) features to comply with Department of Defense (DoD) Minimum Anti-Terrorism Standards for Buildings and MCO 5530.14A Marine Corps Physical Security. This project includes Geospatial Data Surveying/Mapping. |
||||||||||||||||||||||||||||||||
Details | 1 Misc. Buildings, 30,000 SF New Construction.
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |