Similar Projects
Cooling Circulation Pumps and Installation
Term Contract
Post-Bid
Hanover, NH 03755

Well Redevelopment 3
Infrastructure
Post-Bid
Brentwood, NH 03833

Geothermal Well Pump
Results
Boscawen, NH

Deer Estates Cooperative Water System Upgrades
Results
Milan, NH 03588

Ossipee Mountains Estates Cooperative Water System Improvements
Construction
Ossipee, NH 03864

Pump Station No. 2 Replacement
Results
Less than $1,200,000 est. value
Hanover, NH

Wet Well Cleaning Services
Results
Dover, NH

Submersible Sewage Pump
Results
Brentwood, NH 03833

Patterson DMC-3 Stage Fire Pump (Supply and Install)
Results
Tilton, NH 03276

Prospect Booster
Results
Lebanon, NH

Drilled Well and Pump
Results
Less than $29,325 est. value
Danville, NH 03819

Drilled Well and Pump
Results
Less than $30,750 est. value
Greenland, NH 03840

Decommissioning of Three Drilled Wells and One Dug Well
Results
Less than $17,840 est. value
Chester, NH 03036

Dry Well Hoist Replacement
Results
$30,000 to $50,000 est. value
Nashua, NH 03060

Well 2R Control and Chemical Feed Building Project
Results
Conway, North Conway, NH 03860

Last Updated 11/04/2021 01:50 PM
Project Title

Peabody Floway Vertical Turbine Pump - Supply and Install

Physical Address View project details and contacts
City, State (County) Brentwood, NH 03833   (Rockingham County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The supply and installation of a replacement Peabody Floway vertical turbine pump for the Rockingham County Wastewater Treatment Plant. Scope of services to include disconnecting of existing pump/motor from power/control panel. Remove motor from the existing pump, set aside to be reinstalled on the new pump. Remove existing pump through the hatch above, install new pump through the hatch, set in place, bold to existing concrete footer, reinstall motor to pump, reconnect power, start-up and test.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents