Similar Projects
Last Updated | 11/04/2021 01:50 PM |
Project Title | Peabody Floway Vertical Turbine Pump - Supply and Install |
Physical Address | View project details and contacts |
City, State (County) | Brentwood, NH 03833 (Rockingham County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Pumps and Wells |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The supply and installation of a replacement Peabody Floway vertical turbine pump for the Rockingham County Wastewater Treatment Plant. Scope of services to include disconnecting of existing pump/motor from power/control panel. Remove motor from the existing pump, set aside to be reinstalled on the new pump. Remove existing pump through the hatch above, install new pump through the hatch, set in place, bold to existing concrete footer, reinstall motor to pump, reconnect power, start-up and test. |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |