Similar Projects
Partial Site Demolition 720 North Broadway - C123 - City of Aurora
Demolition, Infrastructure
Conception
$700,000 CJ est. value
Aurora, IL 60505

North Russell Avenue - Old Indian Trail to South Dead-End - IC074 - City of Aurora
Infrastructure
Conception
$700,000 CJ est. value
Aurora, IL 60506

100 N. Broadway
New Construction, Infrastructure - 331,863 SF
Design
$70,000,000 CJ est. value
Aurora, IL 60505

Lexington Club
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
St Charles, IL 60174

Bituminous Patching Mixture
Infrastructure
Post-Bid
Elgin, IL

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

FY2022 Pavement and Site Improvements
Infrastructure
Results
Sugar Grove, IL

FY2022 Pavement and Site Improvements
Infrastructure
Results
Sugar Grove, IL

Elgin Distribution Center
New Construction, Infrastructure - 477,115 SF
Construction
$50,000,000 CJ est. value
Elgin, IL 60120

Public Works Combined Maintenance Facility Mass Grading, Site Development and Salt Storage Dome
New Construction, Infrastructure - 200,000 SF
Pending Verification
$9,201,734 CJ est. value
Aurora, IL 60506

Public Works Combined Maintenance Facility Mass Grading, Site Development and Salt Storage Dome
New Construction, Infrastructure - 200,000 SF
Pending Verification
$9,201,734 CJ est. value
Aurora, IL 60506

Pacifica Riverview
New Construction, Infrastructure
Conception
$70,000,000 CJ est. value
Aurora, IL 60506

2022 Geneva Township Resurfacing Contract
Infrastructure
Post-Bid
$700,000 CJ est. value
Geneva, IL 60134

Fay`s Lane and Whispering Oaks Lane Water Main and Roadway Improvements
Infrastructure
Results
$870,545 est. value
Sugar Grove, IL 60554

Timber Trails Park Redevelopment - Saint Charles Park District
New Construction, Infrastructure
Pending Verification
$800,000 CJ est. value
St Charles, IL 60174

Last Updated 08/12/2023 07:35 AM
Project Title

Pavement Reconstruction, Traffic Signals, and Street Lighting on Indian Trail Road

Physical Address View project details and contacts
City, State (County) Aurora, IL 60506   (Kane County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $8,184,713 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Pavement reconstruction, traffic signals, and street lighting on Indian Trail Road from Mitchell Road to Church Road in Aurora. Region 1 District 1 Federal Project # 9jjd(950) County(S) Kane Key Route(S) Fau 1503 Marked Route(S) Indian Trail Road Section(S) 06-00260-02-pv (Aurora) State Job #(S) C-91-080-22 Pps #(S) 0-00107-1005 1-22482-0000 1-22482-0010 180 Working Days Questions not accepted as of June 06, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 223 - Pavement Reconstruction, Traffic Signals, and Street Lighting on Indian Trail Road

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents