Similar Projects
Frito-Lay Automated Distribution Plant and Fulfilment Center
New Construction - 355,000 SF
Conception
$130,000,000 est. value
Poinciana, FL

Coca-Cola Florida Manufacturing and Distribution Center
New Construction - 1,400,000 SF
Conception
$300,000,000 est. value
Brandon, FL 33511

SeaHunter Boats
New Construction - 83,169 SF
Design
Princeton, FL 33032

Oculus Surgical
New Construction - 45,401 SF
Design
$6,900,000 est. value
Port Saint Lucie, FL 34953

Ideal Nutrition Commissary
Build-Out - 42,934 SF
Sub-Bidding
West Palm Beach, FL 33415

Accel International
New Construction, Build-Out - 150,000 SF
Post-Bid
$55,000,000 est. value
Port Saint Lucie, FL 34983

Construction Manager as Constructor for CAE USA Training and Support Center
New Construction - 334,145 SF
Post-Bid
Cape Canaveral, FL

Unifirst - Pompano Beach
New Construction, Addition - 9,056 SF
Construction
$1,200,000 est. value
Pompano Beach, FL 33069

Boston Whaler Expansion
New Construction - 326,000 SF
Construction
$42,000,000 est. value
Edgewater, FL 32141

Gorilla Ammunition
New Construction - 30,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Vero Beach, FL 32967

Paper & Paper Board Fiber Recycling Facility
New Construction - 335,000 SF
Pending Verification
$160,700,000 est. value
Tampa, FL 33605

A Space Storage Industrial Complex
New Construction - 235,224 SF
Conception
Apopka, FL 32703

Hoover Architectural
Renovation - 19,998 SF
Design
$500,000 est. value
Fort Lauderdale, FL 33311

AMSKILLS
Renovation
Post-Bid
Holiday, FL 34690

AmeraTrail Headquarters and Manufacturing Plant - Phase 1
New Construction - 85,000 SF
Construction
$2,663,200 est. value
Saint Cloud, FL 34771

Reported 11/02/2021 09:41 AM
Project Title

Pursuit Boats Facility Expansion Phase 2

Physical Address View project details and contacts
City, State (County) Fort Pierce, FL 34946   (Saint Lucie County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method
Project Status Obtained from a Public Office, Construction Start Expected second quarter 2022, Construction Completion Expected fourth quarter 2022
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Manufacturing/Processing Plant, 1 Story Above Grade, 102,000 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents