Similar Projects
Repair Slumps on Hurricane Ridge and Obstruction Point Road
Alteration
Design
Port Angeles, WA

Professional Architectural Engineering and Consulting Services
New Construction, Infrastructure
Bidding
Bellingham, WA

Mount St. Helens Spirit Lake Intake Headwall
Alteration
Bidding
$10,000,000 to $20,000,000 est. value
Cougar, WA 98616

AE Services IDIQ Recompete
Post-Bid

AE Services IDIQ Recompete
Post-Bid

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

2021 Horse Creek Streambed Repairs Project
Infrastructure
Results
$90,000 to $100,000 est. value
Bothell, WA 98011

Electrical Engineering Services
Infrastructure
Bidding

Architectural And Engineering Services for Housing
New Construction, Infrastructure
Post-Bid
Yakima, WA

Riverwalk Drive SE Non-Motorized Improvements
Infrastructure
Results
Auburn, WA 98092

Facility Reuse Study for Historic Library Building
Renovation, Alteration
Bidding
Vancouver, WA 98663

Architectural and Engineering Professional Services for the Hilton Vancouver Washington Conference Center Hotel
Renovation, Alteration
Post-Bid
Vancouver, WA 98687

Engineering/Architectural Services for First Avenue Plaza Improvements
Renovation, Alteration
Results
Walla Walla, WA

Engineering Support and Services
Alteration
Bidding
WA

Engineering Services for McSorley Creek Shoreline & Estuary Restoration Project
Renovation, Alteration
Post-Bid
$950,000 est. value
Des Moines, WA 98198

Last Updated 10/27/2021 04:16 PM
Project Title

Wenas Creek Fish Passage and Screening Project

Physical Address View project details and contacts
City, State (County) Yakima, WA   (Yakima County)
Category(s) Heavy and Highway, Professional Services
Sub-Category(s) Dock/Pier/Marine, Engineering, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Conduct a site investigation and develop a preliminary design to provide the means for reliable stream flow diversion, accurate stream flow monitoring, and fish passage at the Wenas Irrigation District (WID) facility at the split between North Fork and South Fork Wenas Creek (sometimes known as Dry Creek). The design will also include modifications to two private irrigation diversions upstream of the WID facility to provide fish passage, screening, irrigation pipeline installation, and flow monitoring capabilities. Initial efforts of the project will center on a site investigation and examination of existing data. This will aid in the development of feasible alternatives that provide accurate flow manipulation, water measurement and fish passage at the WID facility, as well as fish passage and screening for the private gravity diversion, and proper screening for the private pump diversion. The alternatives will be reviewed by NYCD in collaboration with a Technical Work Group (TWG) of stakeholders to select a preferred alternative that will be developed into a preliminary design, including report, drawings, and cost estimate.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Irrigation.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Shoreline Protection, Waterway Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents