Similar Projects
Sherburne County Jail Expansion - Sherburne County
Addition, Demolition, Renovation, Infrastructure
Conception
$10,000,000 CJ est. value
Elk River, MN 55330

CSAH 22 - Baugh Street - Reconstruction From CR 64 To CR 65 - Anoka County
Infrastructure
Conception
$7,970,000 CJ est. value
Nowthen, MN 55330

Median Cable Barrier Installation
Infrastructure
Design
$1,900,000 CJ est. value
Clear Lake, MN 55319

Median Cable Barrier Installation
Infrastructure
Design
$1,900,000 CJ est. value
Clear Lake, MN 55319

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2021 Park Improvements
Infrastructure
Results
$592,603 CJ est. value
Saint Augusta, MN 56301

2021 Park Improvements
Infrastructure
Results
$592,603 CJ est. value
Saint Augusta, MN 56301

CSAH 37 Reconstruction Project
Infrastructure
Construction
$6,789,521 CJ est. value
Maple Lake, MN 55358

CSAH 37 Reconstruction Project
Infrastructure
Construction
$6,789,521 CJ est. value
Maple Lake, MN 55358

Norland Truck Sales
New Construction, Infrastructure - 30,300 SF
Pending Verification
$4,000,000 CJ est. value
Big Lake, MN 55309

Norland Truck Sales
New Construction, Infrastructure - 30,300 SF
Pending Verification
$4,000,000 CJ est. value
Big Lake, MN 55309

Highway 169 Frontage/Backage Road Improvements - II-01 - City of Elk River
Infrastructure
Conception
$1,500,000 CJ est. value
Elk River, MN 55330

Big Lake Station / Big Lake
New Construction, Infrastructure
Design
$61,000,000 CJ est. value
Big Lake, MN 55309

TH 24/Hemlock Street Roundabout and Hemlock Street Full Depth Reclamation
Infrastructure
Post-Bid
$2,269,748 CJ est. value
Annandale, MN 55302

Last Updated 02/14/2024 09:31 AM
Project Title

Otsego 2022 Street Renewal Project

Physical Address View project details and contacts
City, State (County) Otsego, MN 55330   (Sherburne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $766,326 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Once all the electronic bids have been reviewed and accepted (AS READ), the preliminary Base Bid results will be shared with all Bidders. Bid results may be viewed at questcdn. BASE BID Remove Sewer Pipe (Storm) 417 LF Rehab Drainage Structures 3 EA Remove Bituminous Pavement 534 SY Sawing Bituminous Pavement (Full Depth) 1346 LF Relocate Sprinkler System (Time and Material) 1 LS Salvage Reclaim Material (3") (EV) - Haul To The City 2730 CY Haul and Dispose Excess Material (EV) 2705 CY Aggregate Base Class 5 (Driveways) 75 TON Respread Salvage Aggregate Reclaim Onsite (Shoulders) (EV) 271 CY Full Depth Reclamation (P) 33033 SY Type SP 9.5 Wearing Course Mixture (2,B) Driveways 98 TON Type SP 9.5 Wearing Course Mixture (2,C) 2728 TON Type SP 12.5 Non Wear Course Mixture (2,C) 3637 TON RC Pipe Culvert 562 LF Concrete Curb & Gutter Surmountable 828 LF 6" Concrete (Driveways) 624 SF Relocate Mail Box and Support 27 EA Traffic Control 1 LS Pulverized Topsoil Borrow (LV) 175 CY Turf Establishment (Hydro Seed) 1.25 AC ALTERNATE BID Special Ditch Grading 1222 LF Remove Bituminous Pavement (Driveways) 98 SY Salvage and Respread Class 5 (Driveways) 269 SY Aggregate Base Class 5 (Driveways) 75 TON Type SP 9.5 Wearing Course Mixture (2,B) Driveways 52 TON Pipe Culvert (Driveway) 512 LF Pulverized Topsoil Borrow (LV) 20 CY Turf Establishment (Hydro Seed) 0.06 AC. BID DOCUMENTS ARE NOT YET AVAILABLE FOR DOWNLOAD.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents