Similar Projects
South Randolphville Road Warehouse Addition
Addition - 151,708 SF
Conception
Piscataway, NJ 08854

Monroe Self Storage - Cube Smart
New Construction - 31,772 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Monroe Township, NJ

Haddad Group Warehouse Expansion
Addition - 37,251 SF
Design
South Brunswick, NJ 08810

Festival Plaza Additions
New Construction - 43,317 SF
Design
Edison, NJ 08817

Abeel Road Warehouse
New Construction, Renovation, Addition - 90,000 SF
Sub-Bidding
$5,000,000 to $10,000,000 CJ est. value
Monroe Township, NJ 08831

Abeel Road Warehouse
New Construction, Renovation, Addition - 90,000 SF
Sub-Bidding
$5,000,000 to $10,000,000 CJ est. value
Monroe Township, NJ 08831

Pre-Qualification for the Raritan River Bridge Replacement Construction Project Construction Contract No. 2 Lift Bridge and Planking Spans Superstructure, Communications, Signal and Overhead Catenary Work
Post-Bid
South Amboy, NJ 08879

Public Storage
New Construction - 96,750 SF
Post-Bid
South Plainfield, NJ 07080

Modifications/Upgrade to Old Bridge Turnpike and Main Street
Results
East Brunswick, NJ 08816

Replacement of Pedestrian Foot Bridge
Results
New Brunswick, NJ 08901

Livingston Avenue Warehouses
New Construction - 600,000 SF
Construction
$10,000,000 CJ est. value
North Brunswick Township, NJ 08902

Stelton Road Office Building Phase I
Addition - 13,500 SF
Construction
Piscataway, NJ 08854

North Tuckahoe Road Warehouse Units
New Construction - 48,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Monroe Township, NJ 08094

Ridge Road Warehouses #2, #4, #5
New Construction - 2,221,983 SF
Pending Verification
$10,000,000 CJ est. value
Dayton, NJ 08810

Warehouse Office Addition
Addition - 1,577 SF
Conception
Edison, NJ 08837

Last Updated 04/30/2020 04:22 PM
Project Title

FedEx Warehouse Expansion

Physical Address View project details and contacts
City, State (County) Keasbey, NJ 08832   (Middlesex County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Bridge, Office, Warehouse/Storage
Contracting Method
Project Status Construction Commenced May 2019, Construction Completion Expected October 2020, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $4,020,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

3,321 SF - 1 Office, 1,287 SF New Construction, 1 Office, 2,034 SF New Construction, 1 Bridge, New Construction, Warehouse/Storage, Addition.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers, Expansion Control.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Embankments, Erosion and Sedimentation Controls, Soil Treatment, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Retaining Walls, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents