Similar Projects
Phase 1 - Tower Terrace Road W/O Barnsley to Alburnett Road Grading and Drainage
Conception
$4,400,000 est. value
Cedar Rapids, IA 52407

USACE UPRR Culverts CC
Conception
$5,000,000 est. value
Cedar Rapids, IA

Fort Randall-Sioux City 230-Kv Transmission Line, Structure 103/4, Access Ramp and Tower Erosion Repair, IA
Term Contract
Design
$250,000 to $500,000 est. value
Sioux City, IA

Modern Woodmen Park Floodwall Extension and Workout Room Addition
Addition, Infrastructure
Bidding
$1,700,000 est. value
Davenport, IA 52802

Singing Hills Boulevard and Harbor Drive Drainage Improvements
Infrastructure
Bidding
$95,000 est. value
Sioux City, IA 51104

Jones Street Culvert Installation
Infrastructure
Post-Bid
Shellsburg, IA

Upper Wapsipinicon WMA - Phase 6 Watershed Improvements
Infrastructure
Post-Bid
IA

Jesup Drainage Ditch
Results
$153,885 est. value
Jesup, IA

Jesup CSD Drainage Improvements
Results
$86,500 est. value
Jesup, IA 50648

USACE McLoud Run LWR CC
Conception
$2,500,000 est. value
Cedar Rapids, IA

Wanatee Tributary Restoration Project
Infrastructure
Bidding
$147,000 est. value
Marion, IA

Riverfront/Downtown Revitalization
Renovation, Infrastructure
Post-Bid
$17,655,000 est. value
Burlington, IA

Cedar Lane Culvert Replacements
Results
$431,000 est. value
Waverly, IA

Phase 3 - Tower Terrace Road from C Avenue to W/O Barnsley Lane Grading and Drainage
Conception
$2,100,000 est. value
Cedar Rapids, IA 52407

NCSML Floodwall and 16th Avenue SW Road Gate
Infrastructure
Post-Bid
$7,900,000 est. value
Cedar Rapids, IA 52404

Last Updated 07/28/2021 12:17 PM
Project Title

8th Street Southwest Between 21st Avenue and 22nd Avenue Drainage Improvements

Physical Address View project details and contacts
City, State (County) Cedar Rapids, IA   (Linn County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $20,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project work generally consists of raising right of way grade and two driveways in order to improve drainage, located at 8th Street SW between 21st Avenue and 22nd Avenue.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Concrete Culverts, Precast Concrete Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents