Similar Projects
Construction Management at Risk Services For Winter Park High School Comprehensive Project
Renovation, Addition
Design
$9,900,000 est. value
Winter Park, FL 32792

Site 50-H-SE-2 High School Relief Project
New Construction
Design
$95,000,000 to $100,000,000 est. value
FL

Orange Technical College Orlando Campus
Renovation - 120,000 SF
Post-Bid
$30,400,000 est. value
Orlando, FL 32801

OCPS Windermere High School Portable Removal Project
Post-Bid
Windermere, FL 34786

Construction Management at Risk Services for Roberto Clemente Middle School Multi Systems Capital Renewal Project
Renovation
Results
$7,850,000 est. value
Orlando, FL 32807

Construction Management at Risk for Ocoee High School Mechanical (HVAC) Capital Renewal Project
Results
$9,470,000 est. value
Ocoee, FL 34761

High School Relief Site 113-H-W-4 Bid Package #IV - Bus Fueling Station
New Construction
Construction
Less than $88,000,000 est. value
Orlando, FL

Site 90-K8-N-7 K8 School
New Construction - 164,000 SF
Construction
Less than $49,000,000 est. value
Apopka, FL 32712

Lakeview Middle School Comprehensive Project
New Construction
Design
$26,000,000 to $30,000,000 est. value
Winter Garden, FL 34787

Ocps-Sy2020-21 16-Site Portable Project
Renovation, Term Contract
Post-Bid
Orlando, FL

Construction Management at Risk for Howard Middle School Comprehensive Project
New Construction
Results
$22,000,000 to $27,000,000 est. value
Orlando, FL 32801

Site 132-M-W-4 Middle School
New Construction - 1,342,559 SF
Construction
$44,900,000 est. value
Orlando, FL 32800

Apopka High School Multi-System Capital Renewal Project
Renovation
Design
$10,600,000 est. value
Apopka, FL 32712

New Construction of Water Spring Middle School
New Construction
Post-Bid
Winter Garden, FL 34778

Construction Management at Risk for Site 129-M-SE-2 Middle School Relief Project
New Construction
Results
$36,000,000 est. value
Orlando, FL

Last Updated 06/22/2022 02:07 PM
Project Title

Site 65-M-W-4 New Multi Story Middle School Project

Physical Address View project details and contacts
City, State (County) Orlando, FL 32809   (Orange County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced January 2022, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $36,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Orange County Public Schools (OCPS) Facilities Services has identified specific needs for a new relief school known as Site 65-M-W-4 (1,348 Student Stations) located in the Town Center West - Horizon West Town Center, west of County Road 545, Avalon Road. The project consists of the reuse of a multi-story, prototype middle school on a new 33.9 acre site to provide facilities, which meet Orange County Public School`s criteria, design standards, and assigned educational program requirements. The estimated construction cost is not to exceed $36,000,000. Major elements of the project include: 1. Preparation of newly developed site for building pad and site infrastructure. 2. Construction of a new multi-story prototype middle school, approximately 185,000 gross square feet, with classrooms, skills/resource labs, art, music, career and technical education labs, administration , kitchen, dining/multi-purpose, media center, gymnasium and support spaces. 3. Construction of new outdoor amenities such as track and field, hard courts and softball fields for the middle school and construction of new PE pavilion, PE Office, toilets, PE storage and outdoor PE amenities such as multi-purpose fields and hard courts. 4. The new facility shall accommodate 1,348 student stations for the middle school. The general services outlined below will be performed: 1. Pre-Construction Phase Services shall include but are not limited to: attending any and all design and preconstruction conferences, assisting and cooperating with the Design Professional with respect to the design of the Project, reviewing and commenting on design documents, constructability review, advertising & conducting pre-bid conference, providing cost estimates & GMP development, preparing construction schedule and incorporating design schedule into a single project schedule, refining general requirements and general conditions, and documenting "as-is" conditions (including offsite and onsite utilities from which connections are to be made). 2. Construction Phase Services include, but are not limited to, furnishing and paying for all management, supervision, financing, labor, materials, tools, fuel, supplies, utilities, equipment and services of every kind and type necessary to diligently, timely and fully perform and complete the construction of the entire Project in a good and workmanlike manner in accordance with the Construction Documents. VBE goal is 3%. LDB:10%

Details

1 Middle/Senior High School, Approximately 185,000 SF New Construction, 33.80 Acres.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents