Project Title | Site 65-M-W-4 New Multi Story Middle School Project |
Physical Address | View project details and contacts |
City, State (County) | Orlando, FL 32809 (Orange County) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | |
Project Status | Construction Commenced January 2022, No Sub Bids Needed |
Bids Due | View project details and contacts |
Estimated Value | $36,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Orange County Public Schools (OCPS) Facilities Services has identified specific needs for a new relief school known as Site 65-M-W-4 (1,348 Student Stations) located in the Town Center West - Horizon West Town Center, west of County Road 545, Avalon Road. The project consists of the reuse of a multi-story, prototype middle school on a new 33.9 acre site to provide facilities, which meet Orange County Public School`s criteria, design standards, and assigned educational program requirements. The estimated construction cost is not to exceed $36,000,000. Major elements of the project include: 1. Preparation of newly developed site for building pad and site infrastructure. 2. Construction of a new multi-story prototype middle school, approximately 185,000 gross square feet, with classrooms, skills/resource labs, art, music, career and technical education labs, administration , kitchen, dining/multi-purpose, media center, gymnasium and support spaces. 3. Construction of new outdoor amenities such as track and field, hard courts and softball fields for the middle school and construction of new PE pavilion, PE Office, toilets, PE storage and outdoor PE amenities such as multi-purpose fields and hard courts. 4. The new facility shall accommodate 1,348 student stations for the middle school. The general services outlined below will be performed: 1. Pre-Construction Phase Services shall include but are not limited to: attending any and all design and preconstruction conferences, assisting and cooperating with the Design Professional with respect to the design of the Project, reviewing and commenting on design documents, constructability review, advertising & conducting pre-bid conference, providing cost estimates & GMP development, preparing construction schedule and incorporating design schedule into a single project schedule, refining general requirements and general conditions, and documenting "as-is" conditions (including offsite and onsite utilities from which connections are to be made). 2. Construction Phase Services include, but are not limited to, furnishing and paying for all management, supervision, financing, labor, materials, tools, fuel, supplies, utilities, equipment and services of every kind and type necessary to diligently, timely and fully perform and complete the construction of the entire Project in a good and workmanlike manner in accordance with the Construction Documents. VBE goal is 3%. LDB:10% |
||||||||||||||||||||||||||||||||||||||
Details | 1 Middle/Senior High School, Approximately 185,000 SF New Construction, 33.80 Acres.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |