Similar Projects
Resurfacing Various Roads 2022
Infrastructure
Bidding
$200,000 est. value
Augusta, GA

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

2019 and 2021 Local Maintenance and Improvement Grant Street Repair and Resurfacing Project
Infrastructure
Post-Bid
Hephzibah, GA

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

LMIG Street Resurfacing
Results
College Park, GA 30337

Corrugated HDPE Pipe
Infrastructure
Post-Bid
Augusta, GA

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

Erosion and Sedimentation Control Items - Annual Contract
Term Contract
Post-Bid
Augusta, GA

2021 LMIG Project
Results
Mount Vernon, GA

Rehabilitation of the Rosedale Dam for Storm Water Retention
Renovation, Alteration
Post-Bid
$5,000,000 to $10,000,000 est. value
Augusta, GA 30909

Augusta Regional Airport Rehabilitate Air Carrier And General Aviation Apron Phase IV
Results
Augusta, GA 30903

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

26.781 Miles of Installation of Navigator Its Systems on I-20/SR 402 Beginning at SR 388 and Extending to the South Carolina State Line and on I-520/SR 415 Beginning at I-20/SR 402 and Extending to the South Carolina State Line
Results

Augusta Canal - Long Gate Spillway Repair
Infrastructure
Post-Bid
Augusta, GA

Mims Road Sidewalk and Drainage Improvements
Results
Hephzibah, GA 30815

Last Updated 05/18/2022 06:27 AM
Project Title

East Augusta Roadway and Drainage Improvements

Physical Address View project details and contacts
City, State (County) Augusta, GA 30901   (Richmond County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents