Similar Projects
Route 1 Elementary School - Fairfax County Public Schools
New Construction, Infrastructure
Conception
$21,169,000 CJ est. value
Mount Vernon, VA 22309

Silver Line Elementary School - Fairfax County
New Construction, Infrastructure
Conception
$57,992,500 CJ est. value
Fairfax, VA 22030

Dunn Loring Elementary School - Fairfax County
New Construction, Infrastructure - 118,000 SF
Design
$35,332,424 CJ est. value
Vienna, VA 22182

Inova Springfield Replacement Campus - Phase 1
New Construction, Infrastructure - 438,800 SF
Design
$400,000,000 CJ est. value
Franconia, VA 22310

Methanol Feed Facilities
New Construction, Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Centreville, VA 20121

RFQ Contractor - Colvin Run Phase II @ Lake Fairfax Park
Infrastructure
Bidding
$4,000,000 CJ est. value
Reston, VA 20190

RFQ D/B - Defense Logistics Agency Overwatch Booths and Dining Patio Pavers
New Construction, Infrastructure
Post-Bid
$1,942,623 CJ est. value
Fort Belvoir, VA 22060

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

Dulles Toll Road Crossing at Innovation Center
Infrastructure, Renovation
Results
$5,300,000 CJ est. value
Herndon, VA 20171

Kingstowne Consolidated Facility
New Construction, Infrastructure - 90,000 SF
Results
$63,649,000 CJ est. value
Alexandria, VA 22315

Brown's Fairfax Mazda
New Construction, Demolition - 103,064 SF
Construction
Fairfax, VA 22030

Louise Archer Elementary School - Fairfax County
Addition, Renovation, Infrastructure - 89,000 SF
Construction
$39,953,000 CJ est. value
Vienna, VA 22180

Liberty Market Mixed-Use / Lorton
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Lorton, VA 22079

Sheehy Automotive - Loisdale / Springfield
New Construction, Infrastructure - 52,000 SF
Pending Verification
$30,000,000 CJ est. value
Springfield, VA 22150

Cub Run Elementary School - Fairfax County
New Construction, Infrastructure
Conception
$61,400,000 CJ est. value
Centreville, VA 20120

Last Updated 03/14/2023 10:42 AM
Project Title

Matan Stonecroft Industrial

Physical Address View project details and contacts
City, State (County) Chantilly, VA 20151   (Fairfax County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $325,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The rezone will be presented to the Fairfax Planning commission April 26, 2023. Information regarding architect or contractor has yet to be determined. A firm construction timeline has not been set, however construction is not expected to begin prior to mid to late 2023.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents