Similar Projects
Professional Services for Water Main Replacements
Bidding
$5,000,000 est. value
Chandler, AZ

Professional Services for Water Main Replacements 2019 - Westwood Manor, Kingston and Chieftain Village
Bidding
Chandler, AZ

Kyrene Middle School Underground Piping Replacement
Term Contract
Post-Bid
$3,200,000 est. value
Tempe, AZ 85284

Professional Services for Loop 101 and Loop 202 Freeway Waterline and Sewer Rehabilitation
Post-Bid
Chandler, AZ 85225

The Grid Mixed Use Project Site Improvements CMAR
Renovation
Results
$2,500,000 to $4,500,000 est. value
Mesa, AZ 85201

Construction of a Water and Sewer Line
Results
Less than $332,464 est. value
Tolleson, AZ 85353

Water Main Replacements
Bidding
$1,000,000 to $5,500,000 est. value
Chandler, AZ

Professional Services For Loop 101 And 202 Freeway Waterline And Sewer Rehabilitation City
Post-Bid
Chandler, AZ

Water Meters
Results
Glendale, AZ 85301

Historic Goodyear Waterline Replacement
Bidding
$5,200,000 est. value
Goodyear, AZ

Loop 101 & 202 Freeway Waterline and Sewer Rehabilitation
Post-Bid
Chandler, AZ 85225

Job Order Contracting Services For Sewer Main And Manholes
Results
Chandler, AZ

Cotton Lane RV Resort Off Site Water Plans
Post-Bid
Goodyear, AZ 85338

Airport Drive Water Line
Results
$142,734 to $261,969 est. value
Queen Creek, AZ 85142

Right-of-Way General Construction
Post-Bid
Phoenix, AZ 85003

Reported 04/01/2021 12:00 AM
Project Title

Festival Ranch Planning Area 2 Kerry Lane Infrastructure Water Line and Offsite Water Line

Physical Address View project details and contacts
City, State (County) Buckeye, AZ   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate - 02/22/21
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes the installation of approximately 5,000 lf of 12" potable waterline and associated facilities within the City of Buckeye as shown on the construction plans, as noted in the bid schedule, and as noted in the bid specifications. This project includes the furnishing of all materials, labor, equipment, tools, transportation, traffic control, and services required for the installation of the reclaimed and potable water lines, and the necessary City of Buckeye requirements for final acceptance.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents