Similar Projects
Downtown - Kirk Avenue 1 - 1068 - City of Roanoke
Alteration
Conception
$252,000 est. value
Roanoke, VA 24011

Melrose Avenue Crossing - 1000 - City of Roanoke
Infrastructure
Conception
$1,600,000 est. value
Roanoke, VA 24017

Regional Maintenance of Grease Trap Services for Hampton Roads Virginia AOR
Term Contract
Design

North Loop Water Main Extension - Thompson Memorial DR to Kessler Mill Road
Infrastructure
Bidding
$2,000,000 est. value
Roanoke, VA

Ductile Iron Fitting
Post-Bid
Roanoke, VA 24012

Sanitary Collection System Flow Monitoring Services
Term Contract
Post-Bid
Roanoke, VA

Washington Heights Waterline Replacement Phase 1
Infrastructure
Results
Roanoke, VA

Construction of the Richard Avenue 3200 Block Sewer Main Extension
Infrastructure
Results
Roanoke, VA 24012

1400 - 1500 Block Main Street - 1003 - City of Roanoke
Infrastructure
Conception
$2,000,000 est. value
Roanoke, VA 24015

Contract for Pipe Purchasing
Infrastructure
Post-Bid
Roanoke, VA

Richard Avenue 3200 Block Sewer Extension
Infrastructure
Results
Roanoke, VA

4000 Block Virginia Avenue - 1081 - City of Roanoke
Infrastructure
Conception
Less than $700,000 est. value
Roanoke, VA 24017

Contract for Ductile Iron Fittings
Infrastructure
Post-Bid
Roanoke, VA

9th Street SE Water Main Extension
Infrastructure
Results
Roanoke, VA 24028

3600 Block Peakwood Drive - 1112 - City of Roanoke
Infrastructure
Conception
$450,000 est. value
Roanoke, VA 24014

Reported 07/11/2022 02:50 PM
Project Title

Downtown - Campbell Avenue 2 - 1145 - City of Roanoke

Physical Address View project details and contacts
City, State (County) Roanoke, VA 24016   (Roanoke City County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2026
Bids Due View project details and contacts
Estimated Value Less than $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will replace existing undersized 15 and 18 pipes with 30 and 36 pipes and add three 12ft VDOT DI-3 series curb inlets to the south side of Campbell Avenue between 3rd Street and 4th Street. The project limits extend across Campbell Avenue between 3rd Street and 4th Street as shown in the image to below. This project is in included in the City of Roanoke FY 2023-2027 Capital Improvement Plan (CIP). As of July 08, 2022, further details regarding design and construction have not been identified.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents