Similar Projects
McBee Coffee & Car Wash
New Construction - 6,335 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Goodlettsville, TN 37072

Andrews Cadillac
New Construction - 20,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
TN 37122

Wash N Roll
New Construction
Design
Lebanon, TN

Express Oil Change
New Construction - 6,072 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
Knoxville, TN 37919

Take 5 Car Wash
New Construction - 4,057 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
Maryville, TN 37801

CarMax #7284
Renovation - 10,143 SF
Post-Bid
Madison, TN

Tesla Motor Sales And Service Center
Renovation - 32,429 SF
Post-Bid
Bartlett, TN 38133

Car Wash Services for City Vehicles
New Construction
Results
Murfreesboro, TN

Delta Materials Handling
New Construction - 15,072 SF
Construction
$2,459,000 est. value
Jackson, TN 38305

Christian Brothers Automotive
New Construction - 5,560 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Murfreesboro, TN 37133

Buc-Ee`s Travel Center
New Construction - 53,400 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Crossville, TN 38555

Camel Express Carwash
New Construction
Pending Verification
Mount Juliet, TN

Doctor Suds Car Wash
New Construction
Design
Jackson, TN

Strickland Brothers Oil Change
New Construction - 1,725 SF
Bidding
$500,000 to $1,000,000 CJ est. value
Smyrna, TN 37167

Take 5 Oil Change
New Construction - 1,431 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Knoxville, TN 37919

Last Updated 05/11/2022 04:53 PM
Project Title

Express Oil Change & Tire

Physical Address View project details and contacts
City, State (County) Millington, TN 38053   (Shelby County)
Category(s) Commercial
Sub-Category(s) Car Wash, Vehicle Sales/Service
Contracting Method
Project Status Construction Commenced fourth quarter 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Vehicle Sales/Service, New Construction.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Fences and Gates, Screening Devices, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents