Similar Projects
SR 45 over Cold Run
Demolition, New Construction, Infrastructure
Conception
$1,155,000 CJ est. value
Millmont, PA 17845

SR 45 over Cold Run
Demolition, New Construction, Infrastructure
Conception
$1,155,000 CJ est. value
Millmont, PA 17845

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

SR 1011 Over White Deer Creek
New Construction, Infrastructure
Results
$1,000,000 to $2,499,999 est. value
PA

Plum Street Improvements Phase 7
Infrastructure
Results
$50,000 est. value

Country View Family Farms Feed Mill Facility
New Construction, Infrastructure
Pending Verification
$47,300,000 CJ est. value
New Columbia, PA 17856

Country View Family Farms Feed Mill Facility
New Construction, Infrastructure
Pending Verification
$47,300,000 CJ est. value
New Columbia, PA 17856

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

Miscellaneous
Infrastructure
Results
$1,000,000 to $2,499,999 est. value
PA

Newman Commons
New Construction, Infrastructure
Pending Verification
$16,000,000 CJ est. value
East Buffalo Township, PA 17837

Last Updated 04/01/2023 03:32 AM
Project Title

N of I-80 to White Deer Cr

Physical Address View project details and contacts
City, State (County) Mifflinburg, PA 17844   (Union County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,729,700 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The description and location of the project are as follows: Milling and resurfacing of existing roadway, including base and joint repairs, scratch and wearing courses, guide rail upgrades, drainage upgrades, pavement markings, and other miscellaneous construction as indicated on approved drawings for STATE ROUTE 15, SECTION 198, in WHITE DEER TOWNSHIP from approximately 0.5 miles north of the SR 80 underpass at Northbound Segment 0350 Offset 0755 to the SR 1010 overpass at Northbound Segment 0380 Offset 0500, and from approximately 0.8 miles north of the SR 80 underpass at Southbound Segment 0341 Offset 3183 to the SR 1010 overpass at Southbound Segment 0381 Offset 0500, in UNION COUNTY. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight NHS DBE: 2% Structure Work: 2.00% Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: RESURFACING/OVERLAYS 408 Version: 2020-5 PennDOT - N of I-80 to White Deer Cr *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents