Similar Projects
West City Line to CSAH 2 - Wright County
Infrastructure
Conception
$522,000 CJ est. value
Maple Lake, MN 55358

West City Line to CSAH 2 - Wright County
Infrastructure
Conception
$522,000 CJ est. value
Maple Lake, MN 55358

Reconstruction
Infrastructure
Design
$9,100,000 CJ est. value
Buffalo, MN 55313

Reconstruction
Infrastructure
Design
$9,100,000 CJ est. value
Buffalo, MN 55313

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

TH 24/Hemlock Street Roundabout and Hemlock Street Full Depth Reclamation
Infrastructure
Post-Bid
$2,269,748 CJ est. value
Annandale, MN 55302

Newcomb Avenue Resurfacing
Infrastructure
Results
$111,420 est. value
Cokato, MN 55321

Dague Avenue Road Improvements
Infrastructure
Results
Buffalo, MN

Advanced Volumetric Alliance Factory
New Construction, Infrastructure - 180,000 SF
Construction
$10,000,000 CJ est. value
Albertville, MN

CSAH 37 Reconstruction Project
Infrastructure
Construction
$6,789,521 CJ est. value
Maple Lake, MN 55358

Monticello Lakes Apartments
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Monticello, MN 55362

Monticello Lakes Apartments
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Monticello, MN 55362

TH 25 to CSAH 14 - Wright County
Infrastructure
Conception
$603,000 CJ est. value
Maple Lake, MN 55358

Albertville Self-Storage Facility
New Construction, Infrastructure - 90,185 SF
Design
$10,000,000 CJ est. value
Albertville, MN 55301

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Last Updated 07/07/2023 01:38 PM
Project Title

T.H. 24/Hemlock St Roundabout & Hemlock St Full Depth Reclamation (FDR) Project

Physical Address View project details and contacts
City, State (County) Annandale, MN 55302   (Wright County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,872,232 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The DBE goal for this project is 12.3% The workforce participation goals for this Project are: 12.3% of Minority and Women. This Work consists of furnishing, installing, maintaining, and removing all traffic control devices required to provide safe movement of traffic and pedestrians through the Project at all times from commencement of the Work until Project Acceptance. Maintain roads and pedestrian facilities undergoing improvements in a condition that accommodates public traffic. Do not close roads or pedestrian facilities, except as authorized. The Engineer may modify the requirements for traffic control as deemed necessary. The Department will maintain Detour Roads established by the Commissioner for through traffic diverted from the Project unless otherwise indicated in the Plan. The use of maintenance crossovers in or near the construction area is permitted if authorized by the Engineer. The Contractor is not responsible for snow removal from roads or pedestrian facilities open to public traffic. Do not suspend operations for the winter until meeting the requirements of 1803.4, Temporary Suspensions. During authorized winter suspension, the Department will maintain traffic control devices. If traffic control devices are damaged or destroyed, the Department will pay the Contractor the value of the device as determined by the Engineer. The work includes the construction of approximately: together with numerous related items of work, all in accordance with Plans and Specifications. This project is subject to Prevailing Wage Rates, Truck Rentals, Equal Employment Opportunity Provisions, and Responsible Contractor Certification. Project Number - HIP-CDS 8623 (220) TH 24/Hemlock St Roundabout with Sidewalk and Pedestrian Improvement, Xcel Energy Lighting, Full Depth Reclamation on Hemlock St

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents