Similar Projects
Front Street Townhomes
New Construction, Infrastructure
Conception
$23,000,000 CJ est. value
Manchester, NH 03102

Canal/Franklin/Main Street Intersection Improvements - City of Nashua
Infrastructure
Conception
Nashua, NH

Thomas More College of Liberal Arts Campus Improvements
Renovation
Design
Merrimack, NH 03054

RFP D/B - Four Golf Course Tees
Infrastructure
Design
$200,000 CJ est. value
Portsmouth, NH 03801

Addition / Fire Station 3
Addition, Demolition, Infrastructure - 360 SF
Bidding
$400,000 CJ est. value
Swanzey, NH 03446

FY2023 Road Program Roadway Rehabilitation, Reconstruction, and Paving
Infrastructure
Bidding
$1,250,000 CJ est. value
Moultonborough, NH 03254

Statewide W Guardrail
Infrastructure
Sub-Bidding
$1,468,260 CJ est. value
Warren, NH 03279

Memorial Park House Door and Frame Replacement
Renovation
Sub-Bidding
$5,993 CJ est. value
Laconia, NH 03246

Portsmouth Christian Academy Drainage & Site Improvements
Renovation
Post-Bid
Dover, NH 03820

Improvement of a Section of The Conway Recreation Path
Post-Bid
Conway, NH 03860

Tennis Court Maintenance
Results
Rochester, NH 03867

Prout Park Improvements
Results
Manchester, NH

Nansen Ski Jump Construction Project
Construction
Milan, NH 03588

Nansen Ski Jump - Sitework
New Construction
Construction
Milan, NH 03588

Langley Cove
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Laconia, NH 03246

Last Updated 08/03/2022 09:32 AM
Project Title

Merrill Park - 359 - City of Concord

Physical Address View project details and contacts
City, State (County) Concord, NH 03301   (Merrimack County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $605,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In 2005, the City completed a comprehensive Master Plan for Merrill Park. The purpose of the plan was to identify and prioritize short and long-term improvements for the facility. Scope includes Crack seal, colorize, stripe and replace standards and backboards with acrylic backboards on the basketball court. Install exercise equipment with poured in place safety surfacing. Replace playground equipment and utilize poured in place safety surfacing. Crack seal, colorize and stripe three (3) tennis courts. Construct pedestrian access bridge over Mill Brook per Merrill Park Master Plan As of August 03 , 2022, this project is currently in the FY 2023-2032 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents