Similar Projects
China Creek Interceptor - City of Centralia
Infrastructure
Conception
$350,000 CJ est. value
Centralia, WA 98531

SR 507/N of Connor Rd - Culvert Replacement
Infrastructure
Design
$123,000 CJ est. value
Rainier, WA 98576

US 12/Clear Fork Bridge - Expansion Joint, Deck Repair and Overlay
Infrastructure, Renovation
Design
$2,540,000 CJ est. value
Randle, WA 98377

ASRP Riparian Area Planting 2022
Term Contract
Post-Bid
Curtis, WA 98538

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Rehabilitate Stevens Canyon Road
Alteration
Results
$15,000,000 to $20,000,000 est. value
Packwood, WA

Mayfield Water System Replacement and Road Realignment
Infrastructure
Results
$2,200,000 est. value
Silver Creek, WA 98585

RFP - Restoration of the Railroad Track
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Chehalis, WA 98532

US 12/Corn Creek Br to 0.5 Miles W of Kosmos Rd - Paving
Infrastructure
Design
$6,245,000 CJ est. value
Morton, WA 98356

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

I-5 / SW Parkland Drive to Harrison Ave - Ramp Meters
Infrastructure
Design
$6,600,000 CJ est. value
Chehalis, WA 98532

Dollar General #22900 / Winlock
New Construction, Infrastructure - 10,640 SF
Post-Bid
$3,000,000 CJ est. value
Winlock, WA 98596

Ls Resurfacing 1
Term Contract
Results
$997,219,550 est. value

Upgrade Yelm Transmission Line to 115-kv - City of Centralia
Infrastructure
Design
$500,000 CJ est. value
Centralia, WA 98531

Last Updated 06/16/2023 02:37 PM
Project Title

Borst Park and Hayes Lake Trails - City of Centralia

Physical Address View project details and contacts
City, State (County) Centralia, WA 98531   (Lewis County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct a trail from Borst Park around Hayes Lake and connect it to Riverside Park. Also, asphalt the trail around Borst Lake. This would include bridging a wetland adjacent to Hayes Lake. Project is included in the City of Centralia's FY 2023-2027 CIP Document. Per the owner, as of June 16, 2023, no capital construction is taking place for this project at this time. Information regarding a design team has not been disclosed by the owner. A timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents