Similar Projects
Authorized Onsite Soil Evaluators (AOSE); Alternative Onsite Sewage Systems (AOSS) Designers and Installers; Plumbing Contractors/Sewer Service Line Installers
Bidding
VA

Airport Comprehensive Sewer Plan: Hospital Sewer Line East
Infrastructure
Bidding
Newport News, VA

Annual Water and Wastewater Construction, Repair and Related Services
Term Contract
Post-Bid
$400,000 to $2,000,000 est. value
VA

Sanitary Sewer Modeling Services
Term Contract
Post-Bid
Charlottesville, VA 22902

Little Hunting Creek Sewer Replacement
Results
$1,500,000 to $2,500,000 est. value
Fairfax, VA 22035

Construction of Little Island Park Pump Station 654 Gravity Sewer Force Main System Improvements
Results
Virginia Beach, VA 23456

Church of Jesus Christ Of Latter-Day Saints - Sanitary Project
Renovation
Construction
Alexandria, VA 22038

Hickory Haven-Samary Forest Sanitary Sewer
Infrastructure
Bidding
VA 23103

Storm Sewer Cleaning and Inspection Services
Post-Bid
$44,855 est. value
Waynesboro, VA 22980

Burton Station Sanitary Sewer Pumping Station #370
Results
$130,000 est. value
Virginia Beach, VA 23456

Annual Construction Contract for Utility Replacement FY2021
Infrastructure
Bidding
Norfolk, VA

Septic Tank Services to include Pumping, Cleaning, Inspections and Minor Repairs
Term Contract
Post-Bid
VA

Water and Sewer Line Installations at Winterpock Elementary School
Results
Chesterfield, VA 23832

Wheeler Avenue Sanitary Sewer Pipe Relining
Infrastructure
Bidding
Alexandria, VA 22304

Pump Station 345 Aragona Witchduck Force Main Replacement
Post-Bid
Virginia Beach, VA 23456

Last Updated 07/12/2021 04:56 PM
Project Title

Upper Quad Stormwater Gravity Sewer at Old Turner Street and Barger Street

Physical Address View project details and contacts
City, State (County) Blacksburg, VA   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $199,999
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project is generally described as the installation of a new gravity sewer from an existing manhole on Old Turner Street traversing below grade through the coal yard adjacent to the Power Plant and tying back into the existing campus stormwater system on Barger Street.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Structure Demolition.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 31 - Earthwork, Earth Moving, Excavation Support and Protection.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents