Similar Projects
Coconut Palm Plaza
New Construction - 42,661 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
West Palm Beach, FL 33412

Carlton Place
New Construction - 865,665 SF
Conception
Clewiston, FL 33440

Old Naples Hotel
New Construction, Build-Out, Demolition - 6,230 SF
Design
Naples, FL

Cornerstone Downtown Coral Springs - Master Plan
New Construction - 157,000 SF
Design
$168,000,000 est. value
Coral Springs, FL 33065

Publix
New Construction, Renovation, Demolition - 143,974 SF
Bidding
Key Largo, FL 33037

Kanner Highway Mixed Use - Master Plan
New Construction - 373,251 SF
Post-Bid
$10,000,000 CJ est. value
Stuart, FL 34994

Griffin Square
New Construction - 12,000 SF
Post-Bid
$3,000,000 est. value
Davie, FL 33328

RMV Main Street Site Improvements Project
Renovation
Results
Princeton, FL 33032

Publix #610
Renovation
Construction
Tallahassee, FL 32305

Publix # 1834 - Ramblewood Square Redevelopment
New Construction, Addition, Demolition - 100,109 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Coral Springs, FL 33071

Oaks Village Plaza
New Construction, Demolition
Pending Verification
Ocala, FL

Varsity Square
Renovation
Pending Verification
$229,382 est. value
Davie, FL 33314

96th Street Retail Plaza
New Construction - 10,100 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Stuart, FL 34997

Palm Pike Crossing - Master Plan
New Construction - 74,553 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Palm City, FL 34990

Festival Marketplace
New Construction - 25,500 SF
Post-Bid
$2,700,000 est. value
Pompano Beach, FL 33073

Reported 04/11/2022 03:59 PM
Project Title

Gatlin Commons Parcel 7

Physical Address View project details and contacts
City, State (County) Port Saint Lucie, FL 34953   (Saint Lucie County)
Category(s) Commercial
Sub-Category(s) Shopping Center/Strip Mall
Contracting Method
Project Status Construction Commenced March 2022, Construction Completion Expected November 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project to include a 9,998 square foot retail plaza with Helix Urgent Care, Dental Care Alliance, and Banfield Pet Hospital

Details

Shopping Center/Strip Mall, 1 Story Above Grade, 9,997 SF New Construction, 45 Parking Spaces, 1.29 Acres.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Wall Coverings, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Loading Dock Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Dental Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Specialty Casework, Healthcare Casework, Dental Casework, Furnishings and Accessories, Rugs and Mats, Office Furniture, Seating, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Compressed-Air Piping for Laboratory and Healthcare Facilities, Dental Compressed-Air Piping, Compressed-Air Equipment for Laboratory and Healthcare Facilities, Dental Compressed-Air Equipment, Vacuum Systems for Laboratory and Healthcare Facilities, Vacuum Piping for Laboratory and Healthcare Facilities, Dental Vacuum Piping, Vacuum Equipment for Laboratory and Healthcare Facilities, Dental Vacuum and Evacuation Equipment, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Distributed Audio-Video Communications Systems, Paging Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents