Similar Projects
$PRESS - Therapy And Wellness Center - Petry-Kuhne Company
New Construction, Infrastructure - 40,000 SF
Design
$14,500,000 CJ est. value
Monticello, IL 61856

ILL 105 South of Cerro Gordo: 1.5" HMA Inlay for 700 FT; Ill 105 at Monticello Near 1-72 Ramps: 1.5" HMA Inlay for 1,100 FT
Infrastructure
Post-Bid
$219,174 est. value
IL

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

567.5 Miles of Spraying, Approximately 2004 Acres on State Right of Way Along US 51 and Interstate Routes including interchanges
Infrastructure
Results

3P Policy Designed Overlay on FAS 1531 (Old IL 47) from ILL 32 to 600E W of Monticello, Piatt County
Infrastructure
Results
IL

Goose Creek Wind / Piatt County
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Monticello, IL 61856

Goose Creek Wind / Piatt County
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Monticello, IL 61856

RFQ - Various Phase II District One Sign and Tower Structure Inspection Projects, Various Routes
Term Contract
Post-Bid
$250,000 CJ est. value
Springfield, IL 62703

Bridge Replacement
Renovation
Results
IL

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Construction of Paved Shoulders and Rumble Strips along Ch 5 from 2.5 Miles South of Deland To 1.00 Mile North if I-72 at Monticello
Infrastructure
Results
$2,000,000 est. value
IL

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Post-Bid
Schaumburg, IL 60194

3P Resurfacing - Designed Overlay of Fap 721 (ILL 10) From ILL 48 at Weldon to I-72
Infrastructure
Results

Seal Coating of Various Streets
Infrastructure
Post-Bid
$300,000 est. value
Bement, IL

Sidewalk Replacement, ADA Ramps, Drainage Improvements
Infrastructure
Results
$154,862 CJ est. value
Monticello, IL 61856

Last Updated 06/20/2023 05:07 AM
Project Title

Bridge Replacement Under Bridge

Physical Address View project details and contacts
City, State (County) Monticello, IL 61856   (Piatt County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $8,349,591 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

0.2 Mi., Bridge Replacement Under Bridge St 0.5 Mi W of Monticello. Region 3 District 5 Federal Project # NHPPPI8K(307) County(s) Piatt Key Route(s) FAI 72 Marked Route(s) I-72 Section(s) (74-68)BR State Job #(s) C-95-021-19 PPS #(s) 5-53234-1000 125 Working Days Questions not accepted as of June 06, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 138 - Bridge Replacement Under Bridge

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents