Similar Projects
PBCI Cultural Arena
New Construction - 31,415 SF
Conception
Atmore, AL

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Renovations to Southeast Alabama Community Action Partnership Housing
Renovation - 3,000 SF
Bidding
$50,000 est. value
Dothan, AL 36303

A New Facility for S.A.I.L
New Construction
Post-Bid
Little River, AL 36550

Renovations and Additions to Colbert County Department of Human Resources
Renovation, Addition
Post-Bid
Muscle Shoals, AL 35661

Air Force Contract Augmentation Program (AFCAP) V
Results

Air Force Contract Augmentation Program (AFCAP) V
Results

Community Safe Room
Post-Bid
Maplesville, AL 36750

Orange Beach Sewer Department Office Building
New Construction
Results
AL

USPFO-AL Construction Multiple Award Task Order Contract (MATOC)
Post-Bid
$2,000 to $6,000,000 est. value

Pro Shop Upgrade and OHV Park at Lakepoint State Park
Results
Less than $550,000 est. value
Baker Hill, Eufaula, AL 36027

Minor Construction Contract
Post-Bid
Anniston, AL 36201

Oneonta High School New Pole Barn
Results
Oneonta, AL 35121

Brewton Utility Department Relocation
Renovation - 3,400 SF
Post-Bid
Less than $550,000 est. value
Brewton, AL 36426

Reported 02/02/2021 12:00 AM
Project Title

Secure Construction SATOC

Physical Address View project details and contacts
City, State (County) State-Wide: AL, AZ, CO, CT, DC, DE, FL, GA, IL, IN, KY, MA, MD, ME, MI, MN, NC, ND, NH, NJ, NM, NY, OH, PA, RI, SC, TN, TX, UT, VA, VT, WI, WV
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Design-Build.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $100,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: This SATOC would be mainly used to renovate and upgrade Intelligence Community (IC) facilities within the Continental United States (CONUS) and Hawaii. The programmatic value of all task orders awarded under this anticipated SATOC is currently estimated to be $100M, therefore, potential prime construction contractors will need a bonding capacity of $100M or greater. The task orders may range in size and complexity from small to large and from non-complex to highly technical. The scope of this contract will encompass Design-Build and Design-Bid-Build renovation and new construction projects. It may also include a broad variety of minor repair, modification, rehabilitation and/or alterations of existing buildings. The salient characteristics of these projects include: Vertical construction, full complement of construction disciplines to include: foundation, infrastructure, site utilities, superstructure, building systems; features of work include: interior/ exterior mechanical/ electrical/ fire protection / HVAC/ architectural finishes/ concrete/ plumbing/ carpentry/ roofing. It may also include, but not be limited to: demolition, geo-technical investigation, infrastructure projects, interior fit-up, communications, security and force protection (AT/FP) projects. The Contractor shall be required to perform all work in accordance with the access and security requirements of the facility. All personnel working on this project must be U.S. citizens. Successful bidders will require Top Secret level of Facility Security Clearance (TS FCL). Details of the security requirements will be provided within the draft DD254 Construction Security Specifications for use during the sample/seed project proposal preparation. A final DD254 will be issued to the successful contractor upon award for the sample/seed project. All succeeding task orders will have a project specific DD254 issued for each task order.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents