Similar Projects
Concrete Sidewalk and Accessible Ramp Project Summer 2022 - Phase II
Infrastructure
Bidding
$80,000 est. value
Charleston, WV

Williamson (Hight) Drainage and Portals
Infrastructure
Post-Bid
Charleston, WV

Striping of the Newly Paved Library Parking Lot
Infrastructure
Post-Bid
Nitro, WV 25143

Inflow and Infiltration Rehabilitation
New Construction
Results
Charleston, WV

Maccorkle Ave SE 1
Results
Charleston, WV 25330

Culvert Pipe Liners and Culvert Inlet Bells
Infrastructure
Post-Bid
Charleston, WV

35th Street E 1 and 1 Various Locations
Results
Charleston, WV 25330

Slide Repair Using Soil Nail Method
Infrastructure
Post-Bid
Charleston, WV

Sissonville Drive 2
Results
Charleston, WV 25330

Salt Rock Public Access Site Slip Repair
Infrastructure
Post-Bid
South Charleston, WV

Seal and Stripe Four (4) Parking Lots
Infrastructure
Results
Charleston, WV

Parking Lot Paving and Repair
Infrastructure
Post-Bid
$140,000 est. value
Charleston, WV

Saint Albans C Street
New Construction
Results
Saint Albans, WV

Parking Lot Paving
Infrastructure
Post-Bid
$230,000 est. value
Chesapeake, WV

Maidsville Lee Mine Drainage
Infrastructure
Results

Reported 07/14/2022 12:00 AM
Project Title

Elk River Slope Repair

Physical Address View project details and contacts
City, State (County) Charleston, WV   (Kanawha County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists primarily of construction of a 125 foot long drilled H-pile retaining wall system consisting of twenty-six (26) wall piles, three (3) dead-man anchors and tie-backs. Also included is the restoration of the asphalt parking lot and grading to promote drainage to existing inlets, removal and replacement of existing fencing, and all necessary incidentals to provide a complete retaining wall system as shown in the plans and specifications.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents