Similar Projects
Capital City Plaza - Phase II
New Construction - 550,000 SF
Conception
Atlanta, GA

Parkside Shopping Center
New Construction
Conception
Sandy Springs, GA 30328

FIFTY Tower
New Construction, Infrastructure
Design
$450,000,000 CJ est. value
Atlanta, GA 30308

FR Estate - Mixed Use
New Construction - 35,719 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Suwanee, GA 30024

High Street
New Construction
Post-Bid
Dunwoody, GA 30346

Link Apartments Lake Park
New Construction - 21,000 SF
Post-Bid
Smyrna, GA 30080

Temple Tract Development
Results
Sugar Hill, GA

General Contractor Services for the New Federal Office Building Space for United States Citizenship and Immigration Service, Peachtree Summit Federal Building, Atlanta, GA
New Construction - 88,000 SF
Results
$5,000,000 to $15,000,000 est. value
Atlanta, GA

Sugarloaf Medical Plaza II
New Construction - 6,100 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Duluth, GA 30097

Hotel Row - Sylvan Building
Renovation - 35,351 SF
Construction
Atlanta, GA 30303

Grove Park Microsoft Offices
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Atlanta, GA 30318

Murphy Crossing Redevelopment / Atlanta
New Construction, Renovation, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Atlanta, GA 30310

Project Silver
New Construction, Infrastructure
Conception
Douglasville, GA

East Village Heights
New Construction - 75,000 SF
Design
$50,000,000 est. value
Alpharetta, GA 30022

Riverside Buick GMC
New Construction
Post-Bid
Cartersville, GA 30120

Last Updated 04/07/2023 01:04 PM
Project Title

Martin Luther King, Jr Boulevard Commercial Renovation

Physical Address View project details and contacts
City, State (County) Savannah, GA 31401   (Chatham County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method Bids by Invitation
Project Status Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the rehabilitation of buildings located at 111 and 119 Martin Luther King, Jr. Blvd and select demolition. As of April 7, 2023, this project has been approved with conditions by the planning board. Permits have not been applied for. A schedule for construction has not been released. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents