Similar Projects
1120 & 1130 N State
Demolition, New Construction, Infrastructure - 10,000 SF
Design
$50,000,000 CJ est. value
Chicago, IL 60610

1120 & 1130 N State
Demolition, New Construction, Infrastructure - 10,000 SF
Design
$50,000,000 CJ est. value
Chicago, IL 60610

Roadway Pavement Rehabilitation
Infrastructure
Post-Bid
Hoffman Estates, IL

Asphalt Parking Lot Removal & Replacement
Demolition, Alteration
Post-Bid
$300,000 est. value
Lansing, Tinley Park, IL 60438

Burley ES - LBP Mitigation and ACM Patch & Repair in the Ventilation System
Term Contract, Infrastructure
Results
$29,725 CJ est. value
Chicago, IL 60657

2022 Sidewalk and Concrete Maintenance
Results
Palatine, IL 60067

Lincoln Yards South Package A-1 & B
Construction
Chicago, IL 60632

Lake Street Office
New Construction, Infrastructure - 67,600 SF
Construction
$16,600,000 CJ est. value
Chicago, IL 60607

Dialysis Care Center Western
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Chicago, IL 60620

Halsted Street Mixed-Use Development
New Construction, Infrastructure - 4,000 SF
Pending Verification
$2,000,000 CJ est. value
Chicago, IL 60614

Bally's Casino / Chicago
LEED Certification, New Construction, Infrastructure
Design
$1,700,000,000 CJ est. value
Chicago, IL 60654

153rd Street Resurfacing
Alteration
Post-Bid
Chicago, IL

McCook and Thornton Reservoirs Rock Wall Stabilization and Geotechnical Instrumentation
Renovation
Results
$8,460,000 to $10,250,000 est. value
Bedford Park, IL 60501

St. Alexius Medical Center Addition
Addition, Infrastructure, Renovation - 29,000 SF
Construction
$14,000,000 CJ est. value
Hoffman Estates, IL 60169

North Rush Street Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$1,900,000 CJ est. value
Chicago, IL 60611

Last Updated 06/12/2023 04:38 PM
Project Title

2023 Sidewalk Renovations at: Prairie View Middle School

Physical Address View project details and contacts
City, State (County) Tinley Park, IL 60487   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $337,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

A. Work covered by Contract Documents: As defined in the contract documents. B. Definitions. The following terms are used throughout the Contract Documents. The work will be governed in accord with the definitions. 1. Fabricated: Fabricated pertains to items specifically assembled or made of selected materials or components to meet individual design requirements. 2. Manufactured: Manufactured means standard units, usually mass produced by an established manufacturer of the respective item. 3. Provide: Provide means furnish and install. 4. Shop fabricated or shop made: Shop fabricated or shop made refers to items made by a Contractor or Subcontractor in their own Shop. C. Insurance 1. Designated Purchaser: a. Owner shall purchase and maintain Builder's Risk Insurance in accord with the General Conditions. b. The Owner's insurance will be subject to a deductible of $5,000 per occurrence. D. Contracts 1. The Owner will award a single construction contract for all work specified in the Contract Documents. 2. Upon award of the construction contract, the owner will issue a Letter of Intent to award a Construction Contract to the approved contractor. This Letter of Intent shall serve as a notice to proceed with the project according to the terms and conditions set forth in the Contract Documents, until the work under Contract Documents is completed. . The contractor shall commence all construction services as specified in the contract documents upon receipt of the Letter of Intent. Anticipated Award of Contract date: June 15, 2023 Anticipated Start of Construction: June 16, 2023 Anticipated Substantial Completion date: September 25, 2023 Lump sum bid proposals will be received for this project at the scheduled time of receipt bids and will be publicly opened at that time. Bid security in the form of a bid bond, certified check or cash in an amount equal to 10 percent of the base bid amount shall be submitted with the bid. Should a bid bond be submitted, the bid bond shall be payable to the Board of Education, Kirby School District 140. H. Bids shall be submitted on or before the specified closing time in an opaque sealed envelope addressed to: Mr. Michael Andreshak, Director of Business Services, Central Administration, Kirby School District 140. The Board of Education reserves the right to reject any or all bids or parts thereof, or waive any irregularities or informalities, and to make the award in the best interest of the District. All bidders must comply with applicable Illinois Law requiring the payment of prevailing wages by all Contractors working on public works. Bidder must comply with the Illinois Statutory requirements regarding labor, including Equal Employment Opportunity Laws. The Board of Education Kirby School District 140 Administrative Center 16931 S. Grissom Drive Tinley Park, Illinois 60477 5/15/23 7432236

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents