Similar Projects
Last Updated | 12/02/2021 11:30 AM |
Project Title | Sand Spring Run Stream Bank Restoration |
Physical Address | View project details and contacts |
City, State (County) | Stroudsburg, PA (Monroe County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $500,000 to $900,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Consists of stabilizing the banks on either side of Sand Spring Run. The project includes the construction of boulder revetment streambank protection, 5 instream grade control structures, bankfull benches, and the regrading of the stream-side embankments to a stable slope. Soil materials removed as a result of project activities will be disposed of and stabilized on-site. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |