Similar Projects
Paddock at Palm City PUD
New Construction, Infrastructure - 5,624 SF
Conception
$25,000,000 CJ est. value
Palm City, FL 34990

Hobe Hills Neighborhood Restoration - 101759 - Martin County
Infrastructure
Conception
$2,150,000 CJ est. value
Hobe Sound, FL 33455

The Altis
New Construction, Infrastructure - 10,000 SF
Design
$2,700,000 CJ est. value
Hobe Sound, FL 33455

The Altis
New Construction, Infrastructure - 10,000 SF
Design
$2,700,000 CJ est. value
Hobe Sound, FL 33455

Dixie Park Repump Station Rehabilitation
Demolition, Renovation, Infrastructure
Bidding
$1,010,000 CJ est. value
Stuart, FL 34997

TCCA Gym Expansion Project
New Construction, Infrastructure
Bidding
$7,138,000 CJ est. value
Stuart, FL 34997

Kanner Highway Mixed Use - Phase IA - Site Development
Infrastructure
Post-Bid
$7,529,703 est. value
Stuart, FL 34994

Kanner Highway Mixed Use - Phase IA - Site Development
Infrastructure
Post-Bid
$7,529,703 est. value
Stuart, FL 34994

Miscellaneous Construction
Infrastructure
Results
$1,000,000 est. value

Asphalt and Sidewalk Rehabilitation
Infrastructure
Results

Wawa #5400 - Palm Pike Crossing / Palm City
New Construction, Infrastructure - 6,119 SF
Construction
$1,095,400 CJ est. value
Palm City, FL 34990

Wawa #5400 - Palm Pike Crossing / Palm City
New Construction, Infrastructure - 6,119 SF
Construction
$1,095,400 CJ est. value
Palm City, FL 34990

Port Cove
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Jensen Beach, FL 34957

Caliber Capital Car Wash / Hobe Sound
New Construction, Infrastructure - 3,648 SF
Pending Verification
$1,200,000 CJ est. value
Hobe Sound, FL 33455

Mr. Clean Car Wash - Palm Pike Crossing / Palm City
New Construction, Infrastructure - 2,475 SF
Conception
$2,000,000 CJ est. value
Palm City, FL 34990

Last Updated 06/26/2023 03:03 PM
Project Title

East Fork Creek Box Culvert Replacement

Physical Address View project details and contacts
City, State (County) Stuart, FL 34994   (Martin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $2,053,294 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The East Fork Creek Box Culvert Replacement project is the removal and replacement of the Box Culvert over the East Fork Creek canal, that is located on Dixie Highway, 0.1 miles Northwest of SE Grafton Avenue, in Stuart, FL. Application No. 210724-6926 The cost estimate for this project is $1,367,000.00. If you have any questions regarding your permit or need any other information, please call us at 1-800-432-2045 or email epermits@sfwmd.gov. The project will consist of replacing the box culvert and separated pedestrian bridge into a single span bridge structure, clearing and grubbing, embankment, excavation, roadway widening, driveway reconstruction, rip-rap installation, guardrail installation and removal, signage and striping. The scope of work also includes erosion control, sodding, temporary traffic control (MOT) and other incidental work as shown and specified in the contract documents. Bidders are encouraged to utilize local vendors for subcontracted work under this Contract. The Contractor and its subcontractors shall take all necessary affirmative steps to assure that minority businesses, women's business enterprises, and labor surplus area firms are used when possible. The County recognizes fair and open competition as a basic tenet of public procurement. Contractors doing business with the County are prohibited from discriminating on the basis of race, color, creed, national origin, handicap, age or sex. Minority-Owned, Woman-Owned, and Small Business Enterprises are encouraged to respond to this solicitation.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents