Similar Projects
Last Updated 10/14/2020 09:26 AM
Project Title

Repair Electrical Distribution

Physical Address View project details and contacts
City, State (County) Montgomery, AL 36108   (Montgomery County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The 187 Fighter Wing located at Dannelly Field, Montgomery, AL, is requesting information, pursuant to FAR PART 10, in support of Market Research, to identify potential sources for construction consisting of removal of existing overhead electrical distribution lines and support structures and installation of new underground electrical distribution systems. The proposed project includes the following: 1. Demolition of existing overhead electrical distribution lines and support structures as indicated on the drawings. 2. Installation of new underground electrical distribution systems by direct bore method as indicated on the drawings. 3. Installation of new sectionalizing cabinets, pad mounted transformers, padmounted switches, and other above grade structures where indicated on the drawings. 4. Modifications to existing primary electrical service entrances to various buildings on base to coordinate with new electrical distribution systems where indicated on the drawings. 5. Replacement of service entrance panelboards where shown. 6. Removal of existing pole mounted street lighting and installation of new street and parking lot lighting systems. 7. Installation of new luminaires on existing poles to provide flight line security lighting. 8. Minor site repair work to return disturbed areas to pre-work conditions including repair/replacement of concrete curbs and gutter, repair/replacement of paving systems, and installation of grass seed/sod. 9. Installation of secondary service metering at all electrical service points and providing metering reporting software for new metering. Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and non-personal services necessary to perform support.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents