Similar Projects
Highway 99W Pedestrian Bridge - City of Sherwood
New Construction, Infrastructure
Conception
$11,500,000 est. value
Sherwood, OR 97140

Alyssum and Twinflower Storm Line Replacement - City of Forest Grove
Infrastructure
Conception
$300,000 est. value
Forest Grove, OR 97116

Fanno Creek Trail: Woodard Park-Bonita Road/85th Avenue-Tualatin Bridge
Infrastructure
Design
$5,980,000 CJ est. value
Tigard, OR 97223

Fanno Creek Trail: Woodard Park-Bonita Road/85th Avenue-Tualatin Bridge
Infrastructure
Design
$5,980,000 CJ est. value
Tigard, OR 97223

Durham Water Resource Reclamation Facility UFAT Expansion
Infrastructure, Renovation
Bidding
$10,400,000 CJ est. value
Tigard, OR 97224

Durham Water Resource Reclamation Facility UFAT Expansion
Infrastructure, Renovation
Bidding
$10,400,000 CJ est. value
Tigard, OR 97224

Dirksen Nature Park Trail and Parking Lot Improvements
Infrastructure
Post-Bid
Tigard, OR 97223

South West 209th Avenue Kinnaman Road to Alexander Street 36-Inch PVC Pipe
Infrastructure
Post-Bid
$150,000 to $200,000 est. value
Aloha, OR 97007

NW 174th Ave Sidewalk Infill - NW Santiam Dr to NW Sandpines Ln
Alteration
Results
$100,000 to $200,000 est. value
OR

ADA Ramps Fischer and Roshak Multiple Locations
Infrastructure
Results
$1,000,000 to $1,500,000 est. value
Hillsboro, OR

403 Black Creek Group Coffee Creek Industrial
New Construction, Infrastructure - 148,279 SF
Pending Verification
$55,000,000 CJ est. value
Sherwood, OR 97140

Amberglen Alta 2 Mixed-Use
New Construction, Infrastructure - 16,000 SF
Pending Verification
$230,000,000 CJ est. value
Hillsboro, OR 97123

JWC North Transmission Line (NTL) Intertie and Transmission Line - City of Beaverton
Infrastructure
Conception
$44,000,000 CJ est. value
Beaverton, OR 97005

OR 99W: I-5 - Mcdonald Street
Alteration
Design
$17,768,000 est. value
Tigard, OR 97281

Valley Park C Ramp and Eagle Point Dock Anchors
Infrastructure
Bidding
$140,000 CJ est. value
Hillsboro, OR 97123

Last Updated 09/07/2022 01:01 PM
Project Title

SE Cornelius Pass Road Butternut Creek Bridge

Physical Address View project details and contacts
City, State (County) Hillsboro, OR 97006   (Washington County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

City Project: PIP-0040-21 The Project cost range is $10,000,000 - $15,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work to be done underthis contract consists of the following in Washington County: 1. Bridge Construction 2. Retaining walls 3. Pipe storm, sanitary, and waterline construction 4. Construction of Roadway approaches including curb, sidewalks, and asphalt surfaces 5. Pathway removal and construction of at-grade and suspended pathways 6. Streetlighting 7. Signing and striping 8. Landscape and irrigation 9. Installation of electrical and communication conduit and appurtenances 10. Additional and incidental work as called for by the Specifications and Plans Project No.:2201053, PIP-0040-21 Question Submission Deadline:September 5, 2022, 1:00pm

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents